- Project Number:
- 023117-000
- Contract Number:
- 023117-000
- Other Project Numbers:
- 023117-000: SP 011-090-006 MN Project No. TA 1124 (300)
- Project Description:
- Gull Point Trail
- Construction Location:
- Gull Point Trail along Gull Point Road between Hillview Forest Road and 1,000 feet south of Poplar Drive. Includes a segment that runs along the channel connected to Gull Lake with a pedestrian bridge crossing the channel.
- City or Township:
- City of East Gull Lake
- Bid Opening:
- 10/03/2024 11:00 AM
- Expected Award Date:
- 11/05/2024
- Project Start Date:
- 11/05/2024
- Construction Start Date:
- 04/28/2025
- Construction End Date:
- 09/30/2025
- Work Type:
- Bituminous
- Project Type:
- Parks and Recreation
- Highest Funding Level:
- Federal
- DBE Project:
- Yes
Grading, bituminous trail, pedestrian bridge, and ADA improvements located on Gull Point Trail from Hillview Forest Road to Gull Point Road.
Project Major Items:
Number | Item | Units | Quantity |
---|
2104.503/00205 | SAWING BIT PAVEMENT (FULL DEPTH) | L F | 945.00 |
2106.507/00130 | COMMON EMBANKMENT (CV) | C Y | 2,387.00 |
2108.504/00037 | GEOTEXTILE FABRIC TYPE 7 | S Y | 2,830.00 |
2211.507/00170 | AGGREGATE BASE (CV) CLASS 5 | C Y | 800.00 |
2232.603/00025 | MILLED RUMBLE STRIPS | L F | 887.00 |
2401.507/03643 | STRUCTURAL CONCRETE (3B52) | C Y | 38.00 |
2401.508/00011 | REINFORCEMENT BARS (EPOXY COATED) | LB | 5,120.00 |
2402.601/00131 | PEDESTRIAN BRIDGE (SUPERSTRUCTURE) | LS | 1.00 |
2521.518/00130 | 3" BITUMINOUS WALK | S F | 36,363.00 |
2557.503/01223 | WIRE FENCE DESIGN 48V-9322 | L F | 521.00 |
2582.503/30104 | 4" SOLID LINE MULTI COMP | L F | 887.00 |
2582.518/06020 | CROSSWALK MULTI COMP GR IN | S F | 90.00 |