Number | Item | Units | Quantity |
---|
2021.501/00010 | MOBILIZATION | LS | 1.00 |
2104.504/00120 | REMOVE BITUMINOUS PAVEMENT | S Y | 1,189.00 |
2106.507/00010 | EXCAVATION - COMMON | C Y | 845.00 |
2106.507/00070 | GRANULAR EMBANKMENT (CV) | C Y | 3,705.00 |
2118.509/00050 | AGGREGATE SURFACING CLASS 5 | TON | 400.00 |
2211.509/00070 | AGGREGATE BASE CLASS 5 | TON | 1,240.00 |
2221.509/00010 | SHOULDER BASE AGGREGATE CLASS 1 | TON | 266.00 |
2360.509 | TYPE SP 12.5 WEARING COURSE MIXTURE (2,C) | TON | 414.00 |
2401.503 | TYPE MOD S (TL-4) BARRIER CONCRETE (3S52) | L F | 418.00 |
2401.507/01143 | STRUCTURAL CONCRETE (1G52) | C Y | 92.00 |
2401.507/03643 | STRUCTURAL CONCRETE (3B52) | C Y | 151.00 |
2401.508/00011 | REINFORCEMENT BARS (EPOXY COATED) | LB | 97,270.00 |
2401.518 | BRIDGE SLAB CONCRETE (3YHPC-M) | S F | 8,119.00 |
2401.601/00010 | STRUCTURE EXCAVATION | LS | 1.00 |
2405.503/00035 | PRESTRESSED CONCRETE BEAMS 35MH | L F | 815.00 |
2442.501/00011 | REMOVE EXISTING BRIDGE A | LS | 1.00 |
2442.501/00012 | REMOVE EXISTING BRIDGE B | LS | 1.00 |
2451.609 | STRUCTURAL BACKFILL | TON | 2,258.00 |
2452.502 | C-I-P CONCRETE TEST PILE 45 FT LONG 12" | EACH | 2.00 |
2452.502 | C-I-P CONCRETE TEST PILE 50 FT LONG 16" | EACH | 2.00 |
2452.503 | C-I-P CONCRETE PILING 12" | L F | 560.00 |
2452.503 | C-I-P CONCRETE PILING 16" | L F | 480.00 |
2563.601/00010 | TRAFFIC CONTROL | LS | 1.00 |
2575.504 | ROLLED EROSION PREVENTION CATEGORY 25 | S Y | 5,010.00 |
2575.504 | ROLLED EROSION PREVENTION CATEGORY 74 | S Y | 157.00 |
2575.504/00110 | RAPID STABILIZATION METHOD 4 | S Y | 500.00 |