Project Number:
SAP 076-606-049
Contract Number:
Other Project Numbers:
Project Description:
Culvert Replacements and Minor Grading
Construction Location:
On CSAH 6 – from Swift CSAH 17 to MnTH 29 (8.974 Miles)
City or Township:
Bid Opening:
05/14/2024 10:00 AM
Expected Award Date:
05/21/2024
Project Start Date:
07/08/2024
Construction Start Date:
07/08/2024
Construction End Date:
08/16/2024
Work Type:
Grading
Project Type:
Road and Street
Highest Funding Level:
State
DBE Project:
No
ADVERTISEMENT FOR BIDS
Swift County
Benson, Minnesota 56215

NOTICE TO CONTRACTORS - Sealed proposals will be received until:

BID OPENING @ 10:00 AM Tuesday May 14th 2024

by the County Engineer on behalf of the Swift County Board of Commissioners, at the Swift County Highway Department Administration Building, 1635 Hoban Avenue (PO Box 241), Benson, MN 56215.

Sealed bids will be opened and publicly read at the above date/time/location, for the following construction project listed below:

State Aid Project No. SAP 076-606-049

Types of work: Culvert Replacements and Minor Grading

Length/Location: On CSAH 6 – from Swift CSAH 17 to MnTH 29 (8.974 Miles)

Combined Major Items:

• Excavation – Common 24,587 CuYd
• Common Embankment (CV) 18,519 CuYd
• Type SP 12.5 Bituminous Wear Course (2,B) 2,351 Ton
• Structure Excavation – Class U (P) 6,151 CuYd
• Granular Backfill 8,664 Ton

Anticipated Award Date: May 21st 2024

Starting Date: July 8th 2024

Completion: 30 Working Days

Information for this project, including copies of the Plans and Proposals, can be found on Swift County’s OneOffice website. This location can be found through a link in the CURRENT PROJECTS page of the Highway Department section of www.swiftcounty.com. OR, access can also be found searching Swift County in the MnDOT eAdvert website, then using the link provided in the on-line advertisement.

Copies of the Plan & Proposal are ONLY available via download, at no cost, with a ConneX account. Being listed as a “Plan Holder” is required to submit a valid bid. The downloading process, which involves filling out your company information, is the only way to meet this requirement. All parties downloading this information will be automatically added to the “Plan Holder” list. This process also ensures that a central contact list is accessible for future addenda. All contractors can also check at any time, who is on the “Plan Holder” list.

- COMPLETE PROPOSALS MUST BE RETURNED WHEN SUBMITTING BIDS -

Bids must be accompanied by a certified check made payable to the Treasurer of Swift County, or a corporate surety bond made in favor of Swift County equal to five percent (5%) of the total bid. The County Board of Commissioners reserves the right to reject any or all bids and to waive any defects.

Tyler Baumchen
Swift County Highway Engineer
April 17th 2024
Project Major Items:
NumberItemUnitsQuantity
2106.507Common Embankment (CV)CuYd18,519.00
2106.507Excavation - CommonCuYd24,587.00
2360.509Type SP 12.5 Bit Wear Course (2,B)Ton2,351.00
2451.507Structure Excavation - Class U (P)CuYd6,151.00
2451.609Granular BackfilTon8,664.00
Project Owner:

Swift County Highway Dept
1635 Hoban Ave
PO Box 241
Benson, MN   56215
(320) 842-5251
paul.petrick@swiftmn.us
Project Engineer:

Tyler Baumchen
1635 Hoban Ave
PO Box 241
Benson, MN   56215
(320) 842-5251
tyler.baumchen@swiftmn.us