- Project Number:
- 1940 Brighton Beach Road
- Contract Number:
- 1940 Brighton Beach
- Other Project Numbers:
- 1940 Brighton Beach Road: 1940 SAP 069-600-045
- Project Description:
- Construction of new road, turn lanes, bituminous roadway, curb & gutter, guardrail, drainage ditches and culverts, and concrete sidewalks.
- Construction Location:
- City or Township:
- Duluth
- Bid Opening:
- 05/01/2024 2:00 PM
- Expected Award Date:
- 05/13/2024
- Project Start Date:
- 05/27/2024
- Construction Start Date:
- 05/27/2024
- Construction End Date:
- 06/23/2025
- Work Type:
- Reconstruct
- Project Type:
- Road and Street
- Highest Funding Level:
- State
- DBE Project:
- No
The project consists of full depth reconstruction of Brighton Beach Road
along a new alignment through Brighton Beach Park from TH 61 to Congdon Boulevard. The work
includes turn lanes on TH 61, bituminous roadway, curb & gutter, guardrail, drainage ditches and culverts,
and concrete sidewalks.