Minnesota County Engineers Association City Engineers Association of Minnesota Minnesota Department of Transportation
Home | Advanced Search | FAQ | Bid Calendar | Privacy Policy |
rss feed icon rss feed icon

Project Number:
074-602-007
Contract Number:
240207
Other Project Numbers:
074-602-007/153-109-015/SP 7480-138
Project Description:
Traffic Signal Revisions
Construction Location:
Owatonna, MN
City or Township:
Owatonna
Bid Opening:
04/09/2024 10:00 AM
Expected Award Date:
04/23/2024
Project Start Date:
05/01/2024
Construction Start Date:
05/01/2024
Construction End Date:
10/31/2024
Work Type:
Traffic Control
Project Type:
Road and Street
Highest Funding Level:
State
DBE Project:
No
Sealed electronic bids for the contract listed below will be received by the Board of County Commissioners of Steele County, Minnesota, until 10:00 AM on Tuesday, April 9, 2024, through Steele County’s online electronic bid system (bidVAULT). At that time, the bids will be electronically opened, read publicly at the Steele County Highway Department, Steele County Public Works Building, 3000 Hoffman Drive NW, Owatonna, Minnesota 55060, and results posted online at https://mn-co-steele.app.rtvision.com/oneoffice/bidding.

ONLY REGISTERED PLANHOLDERS WILL BE ALLOWED TO BID PROJECT. To become a registered plan holder and to bid electronically, you must create an account at: https://connex.uccs.com. Complete digital project documents are available for download at https://mn-co-steele.app.rtvision.com/oneoffice/bidding. There is no cost to register or download the Project Plans and Proposal documents. Project bidding documents may be examined at the Steele County Highway Department, Steele County Public Works Building, 3000 Hoffman Drive NW, Owatonna, Minnesota 55060.

BIDS WILL ONLY BE ACCEPTED BY SUBMITTING AN ELECTRONIC BID USING BIDVAULT at https://bidvault.mn.uccs.com. NO HARD COPY BIDS WILL BE ACCEPTED. Instructions on submitting a bid electronically can be found on the bidVAULT website. The cost to submit a bid is $25.

Bids must be accompanied by a corporate surety bond made in favor of Steele County. Upon execution of the Contract, bid bonds will be returned to the unsuccessful bidders within 30 days of the opening of the bids.

The Steele County Board of Commissioners reserves the right to reject any or all bids or to waive defects.

For questions, contact Paul Sponholz, Assistant County Engineer, at 507-444-7672 or paul.sponholz@steelecountymn.gov.
Project Major Items:
NumberItemUnitsQuantity
2563.601/00010TRAFFIC CONTROLLS1.00
2565.601/00209PAINT SIGNAL SYSTEM ALS1.00
2565.601/00209PAINT SIGNAL SYSTEM BLS1.00
2565.616/00101REVISE SIGNAL SYSTEM ASYS1.00
2565.616/00102REVISE SIGNAL SYSTEM BSYS1.00
Project Owner:

Sponholz, Paul
PO Box 890
3000 Hoffman Drive NW
Owatonna, MN   55060-0890
507-444-7670
paul.sponholz@steelecountymn.gov
Project Engineer:

Sponholz, Paul
PO Box 890
3000 Hoffman Drive NW
Owatonna, MN   55060-0890
507-444-7670
paul.sponholz@steelecountymn.gov