Number | Item | Units | Quantity |
---|
2021.501/00010 | MOBILIZATION | LS | 2.00 |
2104.503/00255 | REMOVE PIPE CULVERTS | L F | 108.00 |
2106.507/00130 | COMMON EMBANKMENT (CV) | C Y | 1,412.00 |
2211.509/00010 | AGGREGATE BASE CLASS 1 | TON | 400.00 |
2412.502/16080 | 16X8 PRECAST CONCRETE BOX CULV END SEC | EACH | 2.00 |
2412.502/16090 | 16X9 PRECAST CONCRETE BOX CULV END SEC | EACH | 2.00 |
2412.503/16080 | 16X8 PRECAST CONCRETE BOX CULVERT | L F | 42.00 |
2412.503/16090 | 16X9 PRECAST CONCRETE BOX CULVERT | L F | 44.00 |
2442.501/00010 | REMOVE EXISTING BRIDGE | LS | 2.00 |
2451.501/00107 | STRUCTURE EXCAVATION CLASS U | C Y | 1,103.00 |
2451.507/00035 | STRUCTURE EXCAVATION CLASS U | C Y | 890.00 |
2451.609/001 | 1 1/2" CRUSHED ROCK BEDDING | TON | 384.00 |
2501.502/04018 | 18" GS PIPE APRON | EACH | 1.00 |
2501.503/06048 | 48" CP PIPE CULVERT (SMOOTH) | L F | 50.00 |
2501.503/12018 | 18" CS PIPE CULVERT | L F | 60.00 |
2502.503/07151 | 15" PE PIPE DRAIN (SMOOTH) | L F | 20.00 |
2511.509/00014 | RANDOM RIPRAP CLASS IV | TON | 219.00 |
2575.504/00110 | RAPID STABILIZATION METHOD 4 | S Y | 2,800.00 |
2575.605/00550 | SEEDING | ACRE | 0.88 |