Project Number:
SAP 017-599-112
Contract Number:
202406
Other Project Numbers:
SAP 017-599-113: SAP 017-599-113
Project Description:
Bridge replacement
Construction Location:
017-599-112: ON FIREFLY TRAIL, 0.16 MILES WEST OF 360TH AVENUE
017-599-113: ON 320TH ST, 1.3 MILES EAST OF CSAH 6
City or Township:
Bid Opening:
03/28/2024 10:00 AM
Expected Award Date:
04/02/2024
Project Start Date:
05/06/2024
Construction Start Date:
05/06/2024
Construction End Date:
11/01/2024
Work Type:
Bridge
Project Type:
Bridges
Highest Funding Level:
Local
DBE Project:
No
See eAdvert for further details.
Project Major Items:
NumberItemUnitsQuantity
2021.501/00010MOBILIZATIONLS2.00
2104.503/00255REMOVE PIPE CULVERTSL F108.00
2106.507/00130COMMON EMBANKMENT (CV)C Y1,412.00
2211.509/00010AGGREGATE BASE CLASS 1TON400.00
2412.502/1608016X8 PRECAST CONCRETE BOX CULV END SECEACH2.00
2412.502/1609016X9 PRECAST CONCRETE BOX CULV END SECEACH2.00
2412.503/1608016X8 PRECAST CONCRETE BOX CULVERTL F42.00
2412.503/1609016X9 PRECAST CONCRETE BOX CULVERTL F44.00
2442.501/00010REMOVE EXISTING BRIDGELS2.00
2451.501/00107STRUCTURE EXCAVATION CLASS UC Y1,103.00
2451.507/00035STRUCTURE EXCAVATION CLASS UC Y890.00
2451.609/0011 1/2" CRUSHED ROCK BEDDINGTON384.00
2501.502/0401818" GS PIPE APRONEACH1.00
2501.503/0604848" CP PIPE CULVERT (SMOOTH)L F50.00
2501.503/1201818" CS PIPE CULVERTL F60.00
2502.503/0715115" PE PIPE DRAIN (SMOOTH)L F20.00
2511.509/00014RANDOM RIPRAP CLASS IVTON219.00
2575.504/00110RAPID STABILIZATION METHOD 4S Y2,800.00
2575.605/00550SEEDINGACRE0.88
Project Owner:

County, Cottonwood
1355 9th Avenue
Windom, MN   56101
507-831-1389
Kyle.Pillatzki@co.cottonwood.mn.us
Project Engineer:

Klisch, Nick
1355 9th Ave
Windom, MN   56101
507-831-1389
nick.klisch@co.cottonwood.mn.us