- Project Number:
- CP 0000-809450
- Contract Number:
- CP 0000-809450
- Other Project Numbers:
- CP 0000-809450: SAP 069-030-069
- Project Description:
- CP 0000-809450, SAP 069-030-069 (Prime); consisting of 7 projects
- Construction Location:
- CP 0025-835225: CSAH 25 between a point 855’ E of CSAH 125 and a point 1,100’ W of Elm Ave; 0.047 Mi.
CP 0068-835226: CSAH 68 between a point 1,874’ W of TH 53 and CR 303; 0.248 Mi.
CP 0079-835228: CSAH 79 between a point 6,305’ S and a point 6,256’ S of CSAH 39; 0.009 Mi.
CP 0106-835229: CSAH 106 between a point 510’ NW and a point 660’ NW of UT 8185 (Comfort Pt Rd); 0.028 Mi.
CP 0141-493350: CSAH 141 between a point 45’ N of Garfield St and a point 95’ N of Cleveland Ave; 0.019 Mi.
CP 0307-835230: CR 307 between a point 985’ of Twp 6729 and a point 1,150’ W of CR 805; 0.027 Mi.
CP 8102-835231: UT 8102 between a point 1,660’ N of CSAH 65 and a point 660’ S of CR 376; 0.017 Mi.
- City or Township:
- Bid Opening:
- 02/15/2024 10:00 AM
- Expected Award Date:
- 03/05/2024
- Project Start Date:
- 05/20/2024
- Construction Start Date:
- 05/20/2024
- Construction End Date:
- 06/29/2024
- Work Type:
- Surfacing
- Project Type:
- Road and Street
- Highest Funding Level:
- State
- DBE Project:
- No
Profile Correction, Excavation, Plant Mixed Bituminous Patches Various Roads, St. Louis County
Project Major Items:
Number | Item | Units | Quantity |
---|
2104.504/00120 | REMOVE BITUMINOUS PAVEMENT | SQ YD | 2,179.00 |
2118.509/00050 | AGGREGATE SURFACING CLASS 5 | TON | 165.00 |
2215.504/00010 | FULL DEPTH RECLAMATION | SQ YD | 3,622.00 |
2360.509/12300 | TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) | TON | 1,338.00 |
2451.507/00015 | STRUCTURE EXCAVATION CLASS E | CU YD | 246.00 |