- Project Number:
- 22-22
- Contract Number:
- 22-22
- Other Project Numbers:
- Project Description:
- South McCarrons Retaining Wall
- Construction Location:
- South McCarrons Blvd, Roseville in Ramsey County, Minnesota
- City or Township:
- Roseville
- Bid Opening:
- 05/16/2023 3:00 PM
- Expected Award Date:
- 05/22/2023
- Project Start Date:
- 06/12/2023
- Construction Start Date:
- 06/12/2023
- Construction End Date:
- 10/27/2023
- Work Type:
- Structural
- Project Type:
- Specialized Construction
- Highest Funding Level:
- State
- DBE Project:
- No
Construction of Soil Nail Concrete Wall at the approximate location of the existing retaining wall on South McCarrons Boulevard.
Project Major Items:
Number | Item | Units | Quantity |
---|
2411.601/00005 | STRUCTURE EXCAVATION | LS | 1.00 |
2411.604/00010 | CONCRETE RETAINING WALL (SPECIAL) | S Y | 569.00 |
2411.618/00320 | ARCHITECTURAL SURFACE FINISH (MULTI COLOR) | S F | 4,667.00 |
2411.618/00540 | ARCHITECTURAL CONCRETE TEXTURE (ROCK FACE) | S F | 4,667.00 |
2452.60200001 | SOIL NAIL | EACH | 271.00 |
2557.50300011 | WIRE FENCE DESIGN SPECIAL TYPE S-2 | L F | 555.00 |
2575.6040001 | HYDROSEEDING SPECIAL TYPE I | SY | 1,303.00 |