- Project Number:
- Swift County Annual Maintenance Striping
- Contract Number:
- Other Project Numbers:
- Project Description:
- Construction Location:
- Various road throughout the County.
- City or Township:
- Bid Opening:
- 08/05/2022 10:00 AM
- Expected Award Date:
- 08/05/2022
- Project Start Date:
- 08/05/2022
- Construction Start Date:
- 08/05/2022
- Construction End Date:
- 10/31/2022
- Work Type:
- Traffic Marking/Striping
- Project Type:
- Road and Street
- Highest Funding Level:
- Local
- DBE Project:
- No
Swift County
2022
Annual Maintenance Striping
The Swift County Highway Department is requesting QUOTES for their Annual Maintenance Roadway Striping until:
10:00 AM Friday August 5th, 2022
Swift County will be striping approximately 46 miles of road throughout the County, along with Stop Bars & Pavement Messages.
The approximate total quantities are listed below, and a map of various roads/locations will be provided. Unless noted on the map as “Center Only”, striping will include 4” White edge line striping on both sides and 4” Broken Yellow centerline (10’ stripes and 40’ spaces). 4” Solid Yellow areas shall also be striped as directed in the field.
Quantities are subject to revision as directed by the Engineer.
Paint materials shall be Yellow and White reflectorized latex paint. All materials and applications shall conform to MnDOT 2020 Specification: 2582. The contractor will be responsible for traffic control to eliminate tracking.
All striping must be completed by October 31th 2022.
Project Major Items:
Number | Item | Units | Quantity |
---|
2582.503 | 4" Broken Line Paint - Yellow | LF | 43,173.00 |
2582.503 | 4" Solid Line Paint - White | LF | 461,842.00 |
2582.503 | 4" Solid Line Paint - Yellow | LF | 58,093.00 |