Project Number:
Swift County Annual Maintenance Weed Spraying
Contract Number:
Other Project Numbers:
Project Description:
Swift County Annual Right-of-Way Weed Control Spraying
Construction Location:
The Northwest portion of Swift County
City or Township:
Bid Opening:
08/05/2022 10:00 AM
Expected Award Date:
08/05/2022
Project Start Date:
08/05/2022
Construction Start Date:
10/01/2022
Construction End Date:
10/31/2022
Work Type:
Clearing and Grubbing
Project Type:
Road and Street
Highest Funding Level:
Local
DBE Project:
No
Swift County
2022
Annual Road Ditch Weed Spraying

The Swift County Highway Department is requesting QUOTES for their Annual Road Ditch Weed Spraying until:

10:00 AM Friday August 5th, 2022

Swift County has designated approximately 148 miles of road to be sprayed throughout the Northwest portion of the County. This mileage (x2 ditches) would include 296 lane-miles of right-of-way to be sprayed with Curtail Herbicide for weed control. A map will be provided.

Quantities are figured on a per ROAD MILE basis, including both sides of the road, and unit price shall include all labor, time, mileage, and materials. Quantities are subject to revision as directed by the Engineer.

All spraying operations are to be completed during the 2022 fall season, after farm crops have turned, and first frost has occurred. Random inspections by Swift County personnel will be conducted.
Project Major Items:
NumberItemUnitsQuantity
1Weed SprayingRoad Mile148.00
Project Owner:

Swift County
1635 Hoban Ave
Benson, MN   56215
(320) 842-5251
paul.petrick@co.swift.mn.us
Project Engineer:

Jorden Roggenbuck
1635 Hoban Ave
Benson, MN   56215
jorden.roggenbuck@co.swift.mn.us