- Project Number:
- SAP 039-630-001
- Contract Number:
- 20224
- Other Project Numbers:
- Project Description:
- Reclaim, Subgrade Excavation, Granular Embankment, Class V Aggregate, Bituminous Pavement.
- Construction Location:
- CSAH 30
- City or Township:
- Wabanica
- Bid Opening:
- 03/31/2022 2:00 PM
- Expected Award Date:
- 04/12/2022
- Project Start Date:
- 05/30/2022
- Construction Start Date:
- 05/30/2022
- Construction End Date:
- 09/02/2022
- Work Type:
- Reconstruct
- Project Type:
- Road and Street
- Highest Funding Level:
- State
- DBE Project:
- No
Road Reconstruction on CSAH 30, CR 197. CR 199
The major items of work are:
Haul and Dispose of Excavated Material 8,207 TON
Granular Embankment 2,256 CY
Bituminous Asphalt 1,617 TON
18” RC Pipe Culvert 714 LF
3” Granite Rock 1,504 CY
Project Major Items:
Number | Item | Units | Quantity |
---|
2105.607 | Subgrade Excavation | CY | 4,754.00 |
2106.609 | Haul and Dispose of Excavated Material | TON | 8,207.00 |
2215.501 | 12" Full Depth Reclaim | SY | 7,638.00 |
2360.509 | Bituminous Asphalt | TON | 1,617.00 |
2501.503 | 18" RC Pipe Culvert | LF | 714.00 |