- Project Number:
- SAP 034-641-010
- Contract Number:
- Other Project Numbers:
- Project Description:
- Construction Location:
- CSAH 41 from Park Ave to CSAH 24
- City or Township:
- Willmar
- Bid Opening:
- 03/15/2022 10:00 AM
- Expected Award Date:
- 04/05/2022
- Project Start Date:
- 05/02/2022
- Construction Start Date:
- 05/02/2022
- Construction End Date:
- 07/01/2022
- Work Type:
- Mill and Overlay
- Project Type:
- Road and Street
- Highest Funding Level:
- State
- DBE Project:
- No
Project SAP 034-641-010, CSAH 41 from 75’ north of Park Avenue to 350’ south of CSAH 24 (Bit. Milling, Full Depth Reclamation, Bit. Surfacing, Storm Sewer)
Combined estimated quantities of work are: Remove Bituminous Pavement – 3255 SQYD, Remove Concrete Walk – 136 SQFT, Full Depth Reclamation (5.0”) – 15250 SQ YD, Mill Bituminous Surface (5.5”) – 15250 SQ YD, Mill Bituminous Surface (3.0”) – 1467 SQYD, Bituminous Mixture – 5897 TON, 12” RC Pipe Sewer – 78 LIN FT, Concrete Curb and Gutter – 144 LIN FT, Concrete Walk – 172 SQFT, Silt Fence Type MS – 636 LIN FT, Boulevard Topsoil Borrow – 273 CU YD, Hydraulic Matrix Type Bonded Fiber Matrix – 1500 LB, Permanent and Temporary Erosion Control Items, and other miscellaneous road construction items.