- Project Number:
- SAP 034-644-008
- Contract Number:
- Other Project Numbers:
- Project Description:
- CSAH 44 from TH 7 to 150th Ave NE
- Construction Location:
- CSAH 44 from TH 7 to 150th Ave SE
- City or Township:
- Bid Opening:
- 05/04/2021 10:00 AM
- Expected Award Date:
- 05/04/2021
- Project Start Date:
- 07/05/2021
- Construction Start Date:
- 07/05/2021
- Construction End Date:
- 11/19/2021
- Work Type:
- Grading
- Project Type:
- Road and Street
- Highest Funding Level:
- State
- DBE Project:
- No
Project SAP 034-644-008, Reconstruction of CSAH 44 from TH 7 to 257’ north of 150th Ave SE.
Combined estimated quantities of work are: Remove Bituminous Pavement – 55900 SQYD, Remove Pipe Culvert – 1496 LIN FT, Excavation-Common(P) – 114661 CUYD, Common Embankment (CV)(P) – 96595 CUYD, Aggregate Base Class 5 – 56756 TON, Sand Backfill(CV) – 598 CUYD, 15” CS Pipe Culvert – 624 LIN FT, 15” GS Pipe Apron – 18 EACH, 24” RC Pipe Culvert – 644 LIN FT, 24” RC Pipe Apron – 18 EACH, 48” RC Pipe Culvert – 108 LIN FT, 48” RC Pipe Apron – 2 EACH, Random Riprap – 135 TON, Filter Topsoil Borrow(CV) – 119 CUYD, Erosion Control Blanket 3N– 44397 SQ YD, Silt Fence – 7661 LIN FT, Seeding – 32 ACRE, Hydraulic Matrix Type Bonded Fiber Matrix – 5285 LB, and other construction items.