- Project Number:
- CP 0000-513155
- Contract Number:
- 513155
- Other Project Numbers:
- CP 0000-513155
- Project Description:
- CP 0000-569260 City of Duluth Chip Seal
- Construction Location:
- City or Township:
- Bid Opening:
- 03/04/2021 10:00 AM
- Expected Award Date:
- 03/23/2021
- Project Start Date:
- 06/14/2021
- Construction Start Date:
- 06/14/2021
- Construction End Date:
- 09/17/2021
- Work Type:
- Surfacing
- Project Type:
- Road and Street
- Highest Funding Level:
- Local
- DBE Project:
- No
CP 0000-513155, SAP 069-030-052 (Low Prime); CP 0000-569260 (Tied) - Chip Sealing, Bituminous Seal Coat, Fog Seal, and Pavement Markings
Project Major Items:
Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2355.506 | BITUMINOUS MATERIAL FOR FOG SEAL | GALLON | 4,310.00 |
2356.504 | BITUMINOUS SEAL COAT | SQ YD | 35,730.00 |
2356.506 | BITUMINOUS MATERIAL FOR SEAL COAT | GALLON | 11,810.00 |
2504.602 | PROTECT VALVE COVER | EACH | 19.00 |
2506.602 | PROTECT CASTING COVER | EACH | 48.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2573.502 | STORM DRAIN INLET PROTECTION | EACH | 26.00 |
2580.503 | INTERIM PAVEMENT MARKING | LIN FT | 18,656.00 |
2582.503 | 4" DBLE SOLID LINE MULTI COMP | LIN FT | 4,664.00 |
2582.503 | 4" SOLID LINE MULTI COMP | LIN FT | 1,150.00 |