Number | Item | Units | Quantity |
---|
2016.601 | QUALITY MANAGEMENT - INTELLIGENT COMPACTION | LUMP SUM | 1.00 |
2016.601 | QUALITY MANAGEMENT - THERMAL PROFILING | LUMP SUM | 1.00 |
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2021.601 | RAILROAD PROTECTIVE SERVICES | LUMP SUM | 1.00 |
2104.503 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 643.00 |
2104.504 | REMOVE BITUMINOUS PAVEMENT | SQ YD | 1,908.00 |
2105.604 | GEOGRID | SQ YD | 6,933.00 |
2118.509 | AGGREGATE SURFACING CLASS 5 | TON | 3,578.00 |
2123.510 | 0.5 CU YD SHOVEL | HOUR | 29.00 |
2123.510 | 8 TON STEEL-WHEELED ROLLER | HOUR | 107.00 |
2123.510 | MOTOR GRADER | HOUR | 107.00 |
2130.523 | WATER | M GALLON | 355.00 |
2131.506 | CALCIUM CHLORIDE SOLUTION | GALLON | 17,327.00 |
2211.509 | AGGREGATE BASE CLASS 5 | TON | 7,676.00 |
2215.504 | FULL DEPTH RECLAMATION | SQ YD | 86,645.00 |
2215.604 | BASE STABILIZATION (BASE ONE) | SQ YD | 86,645.00 |
2232.504 | MILL BITUMINOUS SURFACE (8.0") | SQ YD | 6,933.00 |
2357.506 | BITUMINOUS MATERIAL FOR TACK COAT | GALLON | 5,168.00 |
2360.509 | TYPE SP 12.5 WEARING COURSE MIX (2;C) | TON | 11,154.00 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIX (2;C) | TON | 8,408.00 |
2540.602 | MAIL BOX SUPPORT | EACH | 54.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2580.503 | INTERIM PAVEMENT MARKING | LIN FT | 79,821.00 |
2582.503 | 24" SOLID LINE PREF TAPE GR IN | LIN FT | 168.00 |
2582.503 | 4" BROKEN LINE MULTI COMP | LIN FT | 4,590.00 |
2582.503 | 4" DBLE SOLID LINE MULTI COMP | LIN FT | 11,296.00 |
2582.503 | 4" SOLID LINE MULTI COMP | LIN FT | 14,056.00 |
2582.503 | 6" SOLID LINE MULTI COMP | LIN FT | 67,047.00 |
2582.518 | PAVT MSSG PREF TAPE GR IN | SQ FT | 123.44 |