Minnesota County Engineers Association City Engineers Association of Minnesota Minnesota Department of Transportation
Home | Advanced Search | FAQ | Bid Calendar | Privacy Policy |
rss feed icon rss feed icon

Project Number:
03-2020
Contract Number:
03-2020
Other Project Numbers:
Project Description:
Precast Concrete Box Culverts
Construction Location:
City or Township:
Bid Opening:
11/30/2020 2:00 PM
Expected Award Date:
12/01/2020
Project Start Date:
06/15/2021
Construction Start Date:
06/15/2021
Construction End Date:
08/31/2021
Work Type:
Pipe and Culvert
Project Type:
Road and Street
Highest Funding Level:
State
DBE Project:
No
Work includes the installation of precast concrete box culverts at the following locations:
SAP 041-601-033 â€" CSAH 1 between CSAH 10 & 140th St (Length: 0.057 mi.)
SAP 041-605-024 â€" CSAH 5 between 320th St & 330th St (Length: 0.056 mi.)

Plans and Specifications may be downloaded from the Lincoln County website, www.co.lincoln.mn.us, (see further details on website) or by calling the Lincoln County Highway Department at 507-694-1464 to request a paper copy for a charge of $100.00, includes shipping and tax.
Project Major Items:
NumberItemUnitsQuantity
2412.503PRECAST CONCRETE BOX CULVERTLIN FT308.00
2451.609GRANULAR BACKFILLTON3,479.00
2511.509RIPRAPTON469.00
2575.504EROSION CONTROL BLANKETSQ YD834.00
Project Owner:

Lincoln County Highway Department
PO Box 97
221 North Wallace Ave
Ivanhoe, MN   56142
(507) 694-1464
(507) 694-1101
highway@co.lincoln.mn.us
Project Engineer:

Lincoln County Highway Department
PO Box 97
221 North Wallace Ave
Ivanhoe, MN   56142
(507) 694-1464
(507) 694-1101
highway@co.lincoln.mn.us