Minnesota County Engineers Association City Engineers Association of Minnesota Minnesota Department of Transportation
Home | Advanced Search | FAQ | Bid Calendar | Privacy Policy |
rss feed icon rss feed icon

Project Number:
SAP 040-622-003, SAP 040-626-046, SAP 040-636-011
Contract Number:
Other Project Numbers:
SAP 040-622-003, SAP
Project Description:
Grading, Aggregate Base, Bituminous Pavement, Concrete Curb & Gutter, ADA Improvements, Storm Sewer, Sanitary Sewer, Water Main, Retaining Walls, Turf Restoration, and Related Appurtenances
Construction Location:
CSAH 22
TH 112
City or Township:
Le Sueur
Bid Opening:
02/27/2020 11:00 AM
Expected Award Date:
03/03/2020
Project Start Date:
04/01/2020
Construction Start Date:
05/01/2020
Construction End Date:
10/01/2022
Work Type:
Reconstruct
Project Type:
Road and Street
Highest Funding Level:
State
DBE Project:
No
ADVERTISEMENT FOR BIDS
CSAH 22 (TH 112 Turnback) Improvements
SAP 040-622-003, SAP 040-626-046, SAP 040-636-011
Le Sueur County
Le Sueur, MN
RECEIPT AND OPENING OF PROPOSALS: Sealed proposals for the work described below will be received at the Office of the Le Sueur County Auditor, Le Sueur County, 88 South Park Avenue, Le Center, MN 56057 until 11:00 am on Thursday, February 27, 2020 at which time the bids will be opened and publicly read.
DESCRIPTION OF WORK: The work includes the construction of approximately:
Remove Bituminous Pavement 60,138 SQ YD
Span RC Arch Pipe 541 LIN FT
Clearing 101 TREE
RC Pipe Sewer 11,742 LIN FT
Grubbing 101 TREE
PVC Pipe Sewer 6,715 LIN FT
Common Excavating 63,506 CU YD
DIP Watermain 14,919 LIN FT
Common Embankment 10,301 CU YD
Concrete Walk 63,234 SQ FT
Aggregate, Class 5 27,624 CU YD
Concrete Curb & Gutter 20,654 LIN FT
Type SP 9.5 Wearing Course Mix (4,C) 17,618 TON
Bituminous Trail 61,221 SQ FT
Type SP 12.5 Non-Wearing Course (4,B) 12,246 TON
Non-Metallic Conduit 17,002 LIN FT
Modular Block Retaining Wall 1,416 SQ FT
Sod Type Lawn 16,011 SQ YD
Traffic Control 1 LS
Pedestrian Crosswalk Flasher 1 SYSTEM

together with numerous related items of work, all in accordance with Plans and Specifications. This project is subject to Prevailing Wage Rates and Responsible Contractor Certification.

PLAN HOLDERS LIST, ADDENDUMS AND BID TABULATION: The plan holders list, addendums and bid tabulations will be available for download on-line at
www.bolton-menk.com or www.questcdn.com. Any addendums may also be distributed by mail, fax or email.

TO OBTAIN BID DOCUMENTS: Complete digital project bidding documents are available at www.bolton-menk.com or www.questcdn.com. You may view the digital plan documents for free by entering Quest project #6661796 on the website's Project Search page. Documents may be downloaded for $45.00. Please contact QuestCDN.com at 952-233-1632 or info@questcdn.com for assistance in free membership registration, viewing, downloading, and working with this digital project information. An optional paper set of project documents is also available for a nonrefundable price of $50.00 per set, which includes applicable sales tax and shipping. Please make your check payable to Bolton & Menk, Inc. and send it to 1960 Premier Drive, Mankato, MN 56001, (507) 625-4171, fax (507) 625-4177.

BID SUBMITTAL: A Bid shall be submitted no later than the date and time prescribed and at the place indicated in the advertisement or invitation to bid. For this project the City will be accepting both paper bids and online electronic bids through QuestCDN. To access the electronic bid form, download the project documents and click the online bidding button at the top of the advertisement. Prospective bidders must be on the plan holders list through QuestCDN for bids to be accepted.

BID SECURITY: A certified check or proposal bond in the amount of not less than 5 percent of the total amount bid, drawn in favor of Le Sueur County shall accompany each bid.

OWNER'S RIGHTS RESERVED: The Owner reserves the right to reject any or all bids and to waive any irregularities and informalities therein and to award the Contract to other than the lowest bidder if, in their discretion, the interest of the Owner would be best served thereby.
Dated: January 20, 2020 /s/ Pam Simonette
Le Sueur County Auditor
Published:
QuestCDN: January 29, 2020
Le Sueur County News: January 29, 2020, February 5, 2020, and February 12, 2020
Project Major Items:
NumberItemUnitsQuantity
Aggregate, Class 5CU YD27,624.00
ClearingTREE101.00
Common EmbankmentCU YD10,301.00
Common ExcavatingCU YD63,506.00
GrubbingTREE101.00
Modular Block Retaining WallSQ FT1,416.00
Remove Bituminous PavementSQ YD60,138.00
Traffic ControlLump Sum1.00
Type SP 12.5 Non-Wearing Course (4,B)TON12,246.00
Type SP 9.5 Wearing Course Mix (4,C)TON17,618.00
Project Owner:

Dave Tiegs
88 South Park Ave
Le Center, MN   56057
(507) 357-8200
dtiegs@co.le-sueur.mn.us
Project Engineer:

Cory Bienfang
1960 Premier Drive
Mankato, MN   56001
(507) 625-4171
(507) 625-4177
Cory.Bienfang@bolton-menk.com