- Project Number:
- CP 9112-475837 (Tied)
- Contract Number:
- 348247
- Other Project Numbers:
- CP 9112-475837 (Tied)
- Project Description:
- CP 9112-475837 - TH 73 to End of Bituminous
- Construction Location:
- City or Township:
- Bid Opening:
- 01/23/2020 10:00 AM
- Expected Award Date:
- 02/11/2020
- Project Start Date:
- 05/26/2020
- Construction Start Date:
- 05/26/2020
- Construction End Date:
- 07/18/2020
- Work Type:
- Bituminous
- Project Type:
- Road and Street
- Highest Funding Level:
- Local
- DBE Project:
- No
CP 9112-475837 (Tied) - Bituminous Pavement Reclamation, Aggregate Base Stabilization, Plant Mixed Bituminous Surface, and Aggregate Surfacing
Project Major Items:
Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2104.503 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 114.00 |
2104.504 | REMOVE BITUMINOUS PAVEMENT | SQ YD | 64.00 |
2118.509 | AGGREGATE SURFACING CLASS 5 | TON | 80.00 |
2123.510 | 0.5 CU YD SHOVEL | HOUR | 1.00 |
2123.510 | 8 TON STEEL-WHEELED ROLLER | HOUR | 3.00 |
2123.510 | MOTOR GRADER | HOUR | 3.00 |
2130.523 | WATER | M GALLON | 9.00 |
2131.506 | CALCIUM CHLORIDE SOLUTION | GALLON | 401.00 |
2211.509 | AGGREGATE BASE CLASS 5 | TON | 155.00 |
2215.504 | FULL DEPTH RECLAMATION | SQ YD | 2,004.00 |
2215.604 | BASE STABILIZATION (BASE ONE) | SQ YD | 2,004.00 |
2357.506 | BITUMINOUS MATERIAL FOR TACK COAT | GALLON | 132.00 |
2360.509 | TYPE SP 12.5 WEARING COURSE MIX (2;C) | TON | 201.00 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIX (2;C) | TON | 192.00 |
2540.602 | MAIL BOX SUPPORT | EACH | 5.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |