Number | Item | Units | Quantity |
---|
2016.601 | QUALITY MANAGEMENT | LUMP SUM | 1.00 |
2016.601 | QUALITY MANAGEMENT SPECIAL | LUMP SUM | 1.00 |
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2104.503 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 94.00 |
2104.504 | REMOVE BITUMINOUS PAVEMENT | SQ YD | 758.00 |
2118.609 | RECYCLED AGGREGATE SURFACING | TON | 944.00 |
2123.510 | 0.5 CU YD SHOVEL | HOUR | 10.00 |
2123.510 | 8 TON STEEL-WHEELED ROLLER | HOUR | 36.00 |
2123.510 | MOTOR GRADER | HOUR | 36.00 |
2130.523 | WATER | M GALLON | 119.00 |
2131.506 | CALCIUM CHLORIDE SOLUTION | GALLON | 5,563.00 |
2211.509 | AGGREGATE BASE CLASS 5 | TON | 1,500.00 |
2215.504 | FULL DEPTH RECLAMATION | SQ YD | 29,482.00 |
2215.604 | BASE STABILIZATION (BASE ONE) | SQ YD | 30,131.00 |
2331.604 | ASPHALT OVERLAY TEXTILE (PAVING FABRIC) HEAVY DUTY | SQ YD | 457.00 |
2357.506 | BITUMINOUS MATERIAL FOR TACK COAT | GALLON | 1,531.00 |
2357.506 | BITUMINOUS MATERIAL FOR TACK COAT (PAVING FABRIC) | GALLON | 137.00 |
2360.509 | TYPE SP 12.5 WEARING COURSE MIX (2;C) | TON | 3,555.00 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIX (2;C) | TON | 2,485.00 |
2540.602 | MAIL BOX SUPPORT | EACH | 15.00 |
2554.602 | GUARDRAIL POST | EACH | 25.00 |
2554.603 | REALIGN STRUCTURAL PLATE GUARDRAIL | LIN FT | 500.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2580.503 | INTERIM PAVEMENT MARKING | LIN FT | 5,524.00 |
2582.503 | 24" SOLID LINE PREF TAPE GR IN | LIN FT | 24.00 |
2582.503 | 4" BROKEN LINE MULTI COMP | LIN FT | 2,246.00 |
2582.503 | 4" SOLID LINE MULTI COMP | LIN FT | 3,278.00 |