Number | Item | Units | Quantity |
---|
2015.601 | BLAST MONITOR/SURVEY | LUMP SUM | 1.00 |
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2104.503 | REMOVE PIPE CULVERTS | LIN FT | 34.00 |
2104.503 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 14.00 |
2104.518 | REMOVE BITUMINOUS DRIVEWAY PAVEMENT | SQ FT | 1,356.00 |
2106.507 | EXCAVATION - ROCK | CU YD | 1,002.00 |
2118.509 | AGGREGATE SURFACING CLASS 5 | TON | 103.00 |
2123.510 | 0.5 CU YD SHOVEL | HOUR | 4.00 |
2360.509 | TYPE SP 9.5 BIT MIXTURE FOR ENTRANCES (3,B) | TON | 8.00 |
2501.502 | 15" CS PIPE APRON | EACH | 2.00 |
2501.503 | 15" CS PIPE CULVERT | LIN FT | 36.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2573.503 | SEDIMENT CONTROL LOG TYPE STRAW | LIN FT | 70.00 |
2575.504 | RAPID STABILIZATION METHOD 4 | SQ YD | 500.00 |