Project Number:
CRs 9, 12, 15 & 17
Contract Number:
Winona County
Other Project Numbers:
CPs 1904, 1905, 1906 & 1907 SAP 085-609-019 etal
Project Description:
BITUMINOUS RECLAIM & SURFACING, EXCAVATION, CULVERTS & AGG SHOULDER

Including Full Depth & Stabilized Reclamation, Grading & Base, Bit Paving, Misc Removals, Culverts & Aprons, Riprap, Flexible Concrete Geogrid Mat, Traffic Control, Turf & Striping
Construction Location:
CRs 9, 12, 15 & 17 in the Witoka Area
City or Township:
Witoka
Bid Opening:
04/04/2019 10:00 AM
Expected Award Date:
04/23/2019
Project Start Date:
05/01/2019
Construction Start Date:
05/01/2019
Construction End Date:
10/25/2019
Work Type:
Surfacing
Project Type:
Road and Street
Highest Funding Level:
State
DBE Project:
No
Mobilization - 1 LS
Salvage Energy Absorbing Terminal - 6 Each
Remove Catch Basin - 1 Each
Remove Mailbox Support - 3 Each
Salvage Concrete Apron - 3 Each
Salvage Metal Apron - 1 Each
Sawing Concrete Pavement (Full Depth) - 78 LF
Sawing Bituminous Pavement (Full Depth) - 68 LF
Remove Pipe Culverts & Cattle Passes - 1,094 LF
Remove Sewer Pipe (Storm) - 394 LF
Remove Concrete Curb & Gutter - 98 LF
Salvage Guardrail-Plate Beam - 4,875 LF
Salvage Concrete Pipe Culvert - 8 LF
Salvage Pipe-Arch Culvert - 8 LF
Remove Concrete Driveway Pavement - 21 SY
Geotextile Fabric Type 5 - 2,801 SY
Common Excavation - 3,770 CY
Common Borrow - 200 CY
Shoulder Preparation - 600 LF
Aggregate Shoulder Surfacing & Base Class 2 & Class 2 Modified - 8,901 Ton
Dozer - 40 Hour; Excavaton - 10 Hour
Full Depth Bituminous Pavement Reclamation - 112,808 SY
Stabilized Reclamation (6" Depth) - 36,666 SY
Mill Bituminous Surface - 536 SY
Type SP 12.5 Wearing Course Mix (2,C) - 29,959 Ton
Pavement Density Incentive - 1 LS
Pavement Smoothness Incentive - 135 Seg
Granular Backfill & Granular Backfill (Mod) - 11,979 Ton
Granular Foundation and/or Bedding - 1,314 Ton
CS Pipe Apron 18"-60" - 3 Each
RC Pipe Apron 18"-36" - 22 Each
Install Pipe Apron - 2 Each
CS Pipe Culvert 30" & 60" - 20 LF
RC Pipe Culvert 18"-36" - 605 LF
Install Pipe Culvert & Pipe-Arch Culvert - 16 LF
Repair Culvert Joint (Special) - 1 Each
Clean Pipe Culvert - 1,026 LF
Install Pipe-Arch Apron - 1 Each
Connect to Inplace Masonry Structure (Special) - 1 Each
HPP Pipe Sewer 18" & 24" - 334 LF
Construct Drainage Structure Design 4020 48" & 72" - 3 Each
Connect Existing Draintile to Catch Basin - 2 Each
Lining Pipe Culvert 24"-60" - 862 LF
Random Riprap Class III - 531 CY
Concrete Curb & Gutter Design B624 - 902 LF
6" Concrete Driveway Pavement - 5 SY
Install Mailbox Support - 3 Each
Install Traffic Barrier Design B8338 - 200 LF
Guardrail Post - 6 Each
Install Energy Absorbing Terminal - 6 Each
Install Traffic Barrier - 4,875 LF
Traffic Control - 1 LS
Storm Sewer Inlet Protection - 3 Each
Silt Fence Type MS - 5,814 LF
Sediment Control Log Type Straw - 300 LF
Fertilizer Type 3 - 866 LB
Erosion Control Blanket Cat 3N -11,964 SY
Flexible Concrete Geogrid Mat - 835 SY
Seeding - 2.48 Acres
Seed Mixture 25-141 - 183 LB
Roadway Striping - 107,695 LF
and Miscellaneous and Appurtenant Items required for a Complete Project
Project Owner:

Winona County Highway Department
5300 Highway 61 West
Winona, MN   55987
(507) 457-8840
(507) 454-3699
bspalding@co.winona.mn.us
Project Engineer:

Troy Drath, PE
Winona County Highway Department
5300 Highway 61 West
Winona, MN   55987
(507) 457-8840
(507) 454-3699