- Project Number:
- SAP 080-666-002
- Contract Number:
- 1211
- Other Project Numbers:
- SAP 080-666-002
- Project Description:
- CSAH 66
- Construction Location:
- City or Township:
- Bid Opening:
- 04/16/2019 2:00 PM
- Expected Award Date:
- 04/23/2019
- Project Start Date:
- 05/13/2019
- Construction Start Date:
- 05/13/2019
- Construction End Date:
- 09/06/2019
- Work Type:
- Mill and Overlay
- Project Type:
- Road and Street
- Highest Funding Level:
- State
- DBE Project:
- No
WADENA COUNTY
2019 Construction Projects
Bids Close: April 16th, 2019
Sealed bids will be accepted until 2:00 P.M., April 16th, 2019 by the Wadena County Engineer, on behalf of the Wadena County Board of Commissioners, at the Wadena County Highway Department, 221 Harry & Rich Drive, Wadena, Minnesota 56482 for the following projects:
SAP 080-612-011, Located on CSAH 12, From 60 ft East of Slover Ave. to 140 ft East of SB CSAH 23 in Wadena County, MN; Length: 3.524 Miles
SAP 080-620-009, Located on CSAH 20, Between Juniper Ave and TH 71 in Wadena County, MN; Length: 3.995 Miles
SAP 080-626-023, Located on CSAH 26, Between BR #80538 (PARTRIDGE RIVER) & CSAH 4 in Wadena County, MN; Length: 3.275 Miles
SAP 080-666-002, Located on CSAH 66, Between CSAH 20 & West County Line in Wadena County, MN; Length: 4.527 Miles
Type of Work: GRADING, BTIUMINOUS MILLING, BITUMINOUS PAVING, STABILIZED FULL DEPTH RECLAMATION, UTILITY, SIGNING, AGGREAGATE SHOULDERING, DRAINAGE, CENTERLINE CULVERT REPLACEMENT
This is an abbreviated advertisement. A full advertisement can be viewed by going to the E-Advert site link located on the Highway Department section of the Wadena County website at http://egram.co.wadena.mn.us
Ryan Odden
County Engineer
Project Major Items:
Number | Item | Units | Quantity |
---|
2118.509 | AGGREGATE SURFACING CLASS 1 | TON | 2,110.00 |
2232.504 | MILL BITUMINOUS SURFACE (1.0") | S Y | 81,013.00 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIX (2,B) | TON | 8,734.00 |