Minnesota County Engineers Association City Engineers Association of Minnesota Minnesota Department of Transportation
Home | Advanced Search | FAQ | Bid Calendar | Privacy Policy |
rss feed icon rss feed icon

Project Number:
CR 25 Concrete Overlay w/ Culvert Lining & Replace
Contract Number:
Winona County
Other Project Numbers:
CP 1302 SP 085-625-063 STPF 8518(150)
Project Description:
BITUMINOUS MILLING, CONCRETE OVERLAY, CULVERT LININGS & REPLACEMENTS, AGGREGATE SHOULDERING & BITUMINOUS SURFACE

Including Const Surveying, Full Depth Reclaim, Bit Milling, Culvert Removals, Riprap, Traffic Control, Turf Establishment & Striping
Construction Location:
CR 25 from TH 14 in Lewiston
to 6.95 miles Northeast
City or Township:
Near Lewiston
Bid Opening:
03/19/2018 1:00 PM
Expected Award Date:
03/27/2018
Project Start Date:
04/16/2018
Construction Start Date:
04/16/2018
Construction End Date:
10/05/2018
Work Type:
Concrete
Project Type:
Road and Street
Highest Funding Level:
Federal
DBE Project:
Yes
ESTIMATED QUANTITIES OF WORK
Construction Surveying - 1 LS
Mobilization - 1 LS
Remove Pipe Culverts - 676 LF
Remove RC Cattle Pass - 252 LF
Common Excavation - 2,626 CY
Aggregate Shoulder Surfacing Class 2 - 3,242 Ton
Dozer - 20 Hour
Aggregate Base Class 2 & Class 2 Modified - 4,117 Tons
Full Depth Reclamation - 5,277 SY
Mill Bituminous Surface - 234 SY
Mill Bituminous Surface (2.0") - 95,654 SY
Mill Bituminous Surface (5.0") - 684 SY
Concrete Pavement 5" & 6" - 114,848 SY
Structural Concrete - 17,655 CY
W/C Ratio Incentive/Disincentive - 17,655 CY
Well Graded Aggregate Optional Incentive - 17,655 CY
Course Aggregate Quality Incentive/Disincentive - 17,655 CY
Pavement Smoothness Incentive - 142 Segments
No. 3 Reinforcement Tie Bar 30"' Length (Epoxy Coated) - 19,076 Each
Type SP 12.5 Wearing Course Mix (2,C) - 441 Tons
Granular Backfill - 6,320 Ton
Granular Foundation and/or Bedding - 804 Ton
RC Pipe Culvert 18"-24" - 656 LF
RC Pipe Aprons 18"-24" - 18 Each
CS Pipe Apron 24" - 3 Each
72" High RC Cattle Pass Culvert - 106 LF
72" RC Cattle Pass Apron - 4 Each
Clean Pipe Culvert - 910 LF
Lining Culvert Pipe 18"-24" - 910 LF
Random Riprap Class IV - 305 CY
Traffic Control - 1 LS
Silt Fence Type MS - 1,600 LF
Fertilizer Type 3 - 336 LB
Seeding - 0.96 Acres
Seed Mixture 25-141 - 71 LB
Erosion Control Blanket Cat 3N - 4,668 SY
Roadway Striping Ground-In - 126,091 LF
and Miscellaneous and Appurtenant Items required for a Complete Project.

OTHER PROJECT INFORMATION
Minimum wage rates to be paid by the Contractors have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581 and implementing regulations.

READ CAREFULLY THE WAGE SCALES AND DIVISION A OF THE SPECIAL
PROVISIONS AS THEY AFFECT THIS/THESE PROJECT/PROJECTS

The Minnesota Department of Transportation hereby notifies all bidders:

A minimum goal of 3.5% Good Faith Effort to be subcontracted to Disadvantaged Business Enterprises.

See Full Advertisement for additional information related to Civil Rights and Human Rights Act requriements.
Project Owner:

Winona County Highway Department
5300 Highway 61 West
Winona, MN   55987
(507) 457-8840
(507) 454-3699
bspalding@co.winona.mn.us
Project Engineer:

Winona County Highway Department
5300 Highway 61 West
Winona, MN   55987
(507) 457-8840
(507) 454-3699
bspalding@co.winona.mn.us