Number | Item | Units | Quantity |
---|
| | | 0.00 |
2021.501 | Mobilization | Lump Sum | 1.00 |
2104.501 | Remove Streetcar Tracks | Lin Ft | 5,294.00 |
2104.503 | Remove Brick Sidewalk | Sq Ft | 125,855.00 |
2104.505 | Remove Pavement | Sq Yd | 34,331.00 |
2105.522 | Select Granular Borrow Mod 7% (CV) | Cu Yd | 37,213.00 |
2105.607 | Trench Excavation Class R | Cu Yd | 780.00 |
2211.503 | Aggregate Base (CV) Class 5 | Cu Yd | 10,855.00 |
2232.502 | Mill Concrete Surface 2.0" | Sq Yd | 1,810.00 |
2301.504 | Concrete Pavement 8.0" | Sq Yd | 29,721.00 |
2301.511 | Structural Concrete | Cu Yd | 5,197.00 |
2301.607 | Structural Concrete (Type Special D) | Cu Yd | 1,408.00 |
2451.503 | Granular Backfill (CV) | Cu Yd | 22,382.00 |
2481.618 | Waterproofing | Sq Ft | 20,155.00 |
2504.601 | Temporary Water Service | Lump Sum | 1.00 |
2504.602 | Hydrant Assembly | Each | 22.00 |
2504.603 | Install 20" DIPS HDPE Water Main SDR 11 | Lin Ft | 5,247.00 |
2508.603 | Install 10"/18" HWP | Lin Ft | 5,708.00 |
2521.501 | 6" Concrete Walk Type Special A | Sq Ft | 85,916.00 |
2521.501 | 6" Concrete Walk Type Special B | Sq Ft | 55,846.00 |
2531.501 | Concrete Curb & Gutter Design B624 | 11 | 11,128.00 |
2545.515 | Light Foundation Design Special 1 | Each | 4.00 |
2550.603 | Electrical Duct Bank Type 1 | Lin Ft | 3,707.00 |
2563.601 | Traffic Control | Lump Sum | 1.00 |