Minnesota County Engineers Association City Engineers Association of Minnesota Minnesota Department of Transportation
Home | Advanced Search | FAQ | Bid Calendar | Privacy Policy |
rss feed icon rss feed icon

Project Number:
SAP 069-605-047
Contract Number:
255874
Other Project Numbers:
CP 0005-255874 (Low) SAP 069-605-047
Project Description:
CP 0005-255874 (Low); SAP 069-605-047, CSAH 22 to TH 1 - Reclaim & Overlay
Construction Location:
City or Township:
Bid Opening:
02/22/2018 10:00 AM
Expected Award Date:
03/06/2018
Project Start Date:
06/04/2018
Construction Start Date:
06/04/2018
Construction End Date:
08/15/2018
Work Type:
Bituminous
Project Type:
Road and Street
Highest Funding Level:
State
DBE Project:
No
CP 0005-255874 (Low), SAP 069-605-047; CP 0022-9313 (Tied); CP 0022-153313 (Tied), SAP 069-622-022

Mill Bituminous Surface, Bituminous Patch Mixture, Plant Mixed Bituminous Surface, Bituminous Pavement Reclamation, Aggregate Base, Aggregate Surfacing, Bituminous Surfacing, Bituminous Seal Coat and Culvert Replacement
Project Major Items:
NumberItemUnitsQuantity
2021.501MOBILIZATIONLUMP SUM1.00
2021.601MOBILIZATION, SEAL COATLUMP SUM1.00
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD1,098.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT275.00
2106.501EXCAVATION - COMMONCU YD630.00
2118.501AGGREGATE SURFACING CLASS 5TON6,520.00
2123.503MOTOR GRADERHOUR138.00
2123.5070.5 CU YD SHOVELHOUR39.00
2123.5258 TON STEEL-WHEELED ROLLERHOUR138.00
2130.501WATERM GALLON462.00
2211.501AGGREGATE BASE CLASS 5TON4,314.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD57,298.00
2215.501FULL DEPTH RECLAMATIONSQ YD57,298.00
2232.501MILL BITUMINOUS SURFACE (2.0")SQ YD46,554.00
2232.603MILLED RUMBLE STRIPS-INTERMITTENTLIN FT72,148.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON14,505.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON38,119.00
2356.506BITUMINOUS SEAL COATSQ YD105,885.00
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON6,226.00
2360.501TYPE SP 12.5 WEARING COURSE MIX (2,C)TON14,574.00
2360.501TYPE SP 9.5 WEARING COURSE MIX (2,C)TON11,500.00
2540.602MAIL BOX SUPPORTEACH28.00
2554.501TRAFFIC BARRIER DESIGN B8307LIN FT225.00
2554.523END TREATMENT-ENERGY ABSORBING TERMINALEACH4.00
2554.603RAISE GUARDRAILLIN FT1,200.00
2563.601TRAFFIC CONTROLLUMP SUM1.00
2563.601TRAFFIC CONTROL, SEAL COATLUMP SUM1.00
2563.601WORK ZONE SPEED LIMITLUMP SUM1.00
2573.533SEDIMENT CONTROL LOG TYPE STRAWLIN FT250.00
2574.525COMMON TOPSOIL BORROWCU YD85.00
2575.572RAPID STABILIZATION METHOD 4SQ YD1,000.00
2580.603INTERIM PAVEMENT MARKINGLIN FT76,456.00
2580.603INTERIM PAVEMENT MARKINGLIN FT81,720.00
2582.50224" SOLID LINE PREF TAPE GR INLIN FT135.00
2582.5024" BROKEN LINE EPOXYLIN FT6,230.00
2582.5024" DBLE SOLID LINE EPOXYLIN FT10,905.00
2582.5024" SOLID LINE EPOXYLIN FT11,400.00
2582.5026" SOLID LINE EPOXYLIN FT83,475.00
Project Owner:

St. Louis Co., Bid Information
4787 Midway Road
Duluth, MN   55811
(218) 625-3830
(218) 625-3888
JohnsonR2@stlouiscountymn.gov
Project Engineer:

Fallstrom, Eric
7823 Highway 135
Virginia, MN   55792
(218) 742-9820
218
fallstromE@stlouiscountymn.gov