Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2021.601 | MOBILIZATION, SEAL COAT | LUMP SUM | 1.00 |
2101.511 | CLEARING & GRUBBING | LUMP SUM | 1.00 |
2104.501 | REMOVE PIPE CULVERTS | LIN FT | 687.00 |
2104.513 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 64.00 |
2105.604 | GEOTEXTILE FABRIC TYPE VI | SQ YD | 1,805.00 |
2106.501 | EXCAVATION - COMMON | CU YD | 62.00 |
2118.501 | AGGREGATE SURFACING CLASS 5 | TON | 2,450.00 |
2123.503 | MOTOR GRADER | HOUR | 53.00 |
2123.507 | 0.5 CU YD SHOVEL | HOUR | 15.00 |
2123.525 | 8 TON STEEL-WHEELED ROLLER | HOUR | 53.00 |
2130.501 | WATER | M GALLON | 176.00 |
2211.501 | AGGREGATE BASE CLASS 5 | TON | 1,644.00 |
2211.503 | AGGREGATE BASE (CV) CLASS 5 | CU YD | 601.00 |
2215.501 | STABILIZED FULL DEPTH RECLAMATION | SQ YD | 48,166.00 |
2232.501 | MILL BITUMINOUS SURFACE (2.0") | SQ YD | 34,352.00 |
2355.502 | BITUMINOUS MATERIAL FOR FOG SEAL | GALLON | 4,954.00 |
2355.502 | BITUMINOUS MATERIAL FOR FOG SEAL | GALLON | 5,367.00 |
2356.505 | BITUMINOUS MATERIAL FOR SEAL COAT | GALLON | 14,243.00 |
2356.506 | BITUMINOUS SEAL COAT | SQ YD | 39,565.00 |
2357.502 | BITUMINOUS MATERIAL FOR TACK COAT | GALLON | 2,123.00 |
2360.501 | TYPE SP 12.5 WEARING COURSE MIX (2;C) | TON | 5,102.00 |
2360.501 | TYPE SP 9.5 WEARING COURSE MIX (2,C) | TON | 3,924.00 |
2363.509 | BITUMINOUS MATERIAL FOR MIXTURE | TON | 708.00 |
2451.501 | STRUCTURE EXCAVATION CLASS E | CU YD | 5,777.00 |
2451.503 | GRANULAR BACKFILL (CV) | CU YD | 1,225.00 |
2451.507 | GRANULAR BEDDING (CV) | CU YD | 484.00 |
2501.511 | 24" RC PIPE CULVERT | LIN FT | 190.00 |
2501.511 | 30" RC PIPE CULVERT | LIN FT | 284.00 |
2501.511 | 36" RC PIPE CULVERT | LIN FT | 112.00 |
2501.515 | 24" RC PIPE APRON | EACH | 6.00 |
2501.515 | 30" RC PIPE APRON | EACH | 8.00 |
2501.515 | 36" RC PIPE APRON | EACH | 2.00 |
2501.521 | 22" SPAN RC PIPE-ARCH CULV CL IIA | LIN FT | 30.00 |
2501.525 | 22" SPAN RC PIPE-ARCH APRON | EACH | 2.00 |
2511.501 | RANDOM RIPRAP CLASS III | CU YD | 19.00 |
2540.602 | MAIL BOX SUPPORT | EACH | 13.00 |
2554.501 | TRAFFIC BARRIER DESIGN B8307 | LIN FT | 900.00 |
2554.523 | END TREATMENT-ENERGY ABSORBING TERMINAL | EACH | 8.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2563.601 | TRAFFIC CONTROL, SEAL COAT | LUMP SUM | 1.00 |
2563.601 | WORK ZONE SPEED LIMIT | LUMP SUM | 1.00 |
2573.502 | SILT FENCE, TYPE HI | LIN FT | 530.00 |
2573.533 | SEDIMENT CONTROL LOG TYPE STRAW | LIN FT | 588.00 |
2573.550 | EROSION CONTROL SUPERVISOR | LUMP SUM | 1.00 |
2573.560 | CULVERT END CONTROLS | EACH | 9.00 |
2575.572 | RAPID STABILIZATION METHOD 4 | SQ YD | 3,552.00 |
2580.603 | INTERIM PAVEMENT MARKING | LIN FT | 32,538.00 |
2580.603 | INTERIM PAVEMENT MARKING | LIN FT | 45,447.00 |
2582.502 | 24" SOLID LINE PREF TAPE GR IN | LIN FT | 24.00 |
2582.502 | 4" BROKEN LINE EPOXY | LIN FT | 2,600.00 |
2582.502 | 4" DBLE SOLID LINE EPOXY | LIN FT | 2,537.00 |
2582.502 | 4" SOLID LINE EPOXY | LIN FT | 8,595.00 |
2582.502 | 6" SOLID LINE EPOXY | LIN FT | 30,684.00 |