Number | Item | Units | Quantity |
---|
2016.601 | QUALITY MANAGEMENT | LUMP SUM | 1.00 |
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2021.601 | MOBILIZATION, SEAL COAT | LUMP SUM | 1.00 |
2104.501 | REMOVE GUARDRAIL | LIN FT | 530.00 |
2104.505 | REMOVE BITUMINOUS PAVEMENT | SQ YD | 6,800.00 |
2104.513 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 187.00 |
2118.501 | AGGREGATE SURFACING CLASS 5 | TON | 8,187.00 |
2123.503 | MOTOR GRADER | HOUR | 95.00 |
2123.525 | 8 TON STEEL-WHEELED ROLLER | HOUR | 95.00 |
2130.501 | WATER | M GALLON | 318.00 |
2131.502 | CALCIUM CHLORIDE SOLUTION | GALLON | 19,538.00 |
2211.501 | AGGREGATE BASE CLASS 5 | TON | 3,551.00 |
2211.604 | AGGREGATE BASE STABILIZATION | SQ YD | 93,040.00 |
2215.501 | FULL DEPTH RECLAMATION | SQ YD | 93,040.00 |
2232.603 | MILLED RUMBLE STRIPS-INTERMITTENT | LIN FT | 36,722.00 |
2355.502 | BITUMINOUS MATERIAL FOR FOG SEAL | GALLON | 10,420.00 |
2356.505 | BITUMINOUS MATERIAL FOR SEAL COAT | GALLON | 24,562.00 |
2356.506 | BITUMINOUS SEAL COAT | SQ YD | 68,229.00 |
2357.502 | BITUMINOUS MATERIAL FOR TACK COAT | GALLON | 5,151.00 |
2360.501 | TYPE SP 12.5 WEARING COURSE MIX (2,C) | TON | 10,561.00 |
2360.501 | TYPE SP 9.5 WEARING COURSE MIX (2,C) | TON | 11,700.00 |
2540.602 | MAIL BOX SUPPORT | EACH | 31.00 |
2554.501 | TRAFFIC BARRIER DESIGN B8307 | LIN FT | 1,230.00 |
2554.523 | END TREATMENT-ENERGY ABSORBING TERMINAL | EACH | 7.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2563.601 | TRAFFIC CONTROL, SEAL COAT | LUMP SUM | 1.00 |
2563.601 | WORK ZONE SPEED LIMIT | LUMP SUM | 1.00 |
2580.603 | INTERIM PAVEMENT MARKING | LIN FT | 56,870.00 |
2580.603 | INTERIM PAVEMENT MARKING | LIN FT | 56,870.00 |
2582.501 | PAVT MSSG PREF TAPE GR IN | SQ FT | 98.04 |
2582.502 | 24" SOLID LINE PREF TAPE GR IN | LIN FT | 42.00 |
2582.502 | 4" BROKEN LINE EPOXY | LIN FT | 6,935.00 |
2582.502 | 4" DBLE SOLID LINE EPOXY | LIN FT | 4,270.00 |
2582.502 | 4" SOLID LINE EPOXY | LIN FT | 10,295.00 |
2582.502 | 6" SOLID LINE EPOXY | LIN FT | 56,050.00 |