- Project Number:
- CP 0526-298689 (Tied)
- Contract Number:
- 275030
- Other Project Numbers:
- CP 0526-298689 (Tied)
- Project Description:
- CP 0526-298689 (Tied) - Reclaim & Overlay
- Construction Location:
- City or Township:
- Bid Opening:
- 02/15/2018 10:00 AM
- Expected Award Date:
- 03/06/2018
- Project Start Date:
- 05/21/2018
- Construction Start Date:
- 05/21/2018
- Construction End Date:
- 08/15/2018
- Work Type:
- Bituminous
- Project Type:
- Road and Street
- Highest Funding Level:
- Local
- DBE Project:
- No
CP 0026-275030 (Low), SAP 069-626-012; CP 0026-275994 (Tied), SAP 069-626-013; CP 0411-153311 (Tied); CP 0526-298689 (Tied)
Bituminous Pavement Reclamation, Plant Mix Bituminous and Recycled Aggregate Surfacing, Bituminous Seal Coat, Bituminous Milling, Plant Mix Bituminous Surface and Aggregate Surfacing, Cold-In Place Reclamation, Plant Mix Bituminous Pavement and Bituminous Seal Coat
Project Major Items:
Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2021.601 | MOBILIZATION, SEAL COAT | LUMP SUM | 1.00 |
2104.505 | REMOVE BITUMINOUS PAVEMENT | SQ YD | 109.00 |
2104.513 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 57.00 |
2105.501 | COMMON EXCAVATION | CU YD | 61.00 |
2118.501 | AGGREGATE SURFACING CLASS 5 | TON | 339.00 |
2123.507 | 0.5 CU YD SHOVEL | HOUR | 5.00 |
2331.604 | COLD IN-PLACE RECYCLE BIT MIXTURE | SQ YD | 25,667.00 |
2355.502 | BITUMINOUS MATERIAL FOR FOG SEAL | GALLON | 3,080.00 |
2355.502 | BITUMINOUS MATERIAL FOR FOG SEAL | GALLON | 3,671.00 |
2356.505 | BITUMINOUS MATERIAL FOR SEAL COAT | GALLON | 7,392.00 |
2356.506 | BITUMINOUS SEAL COAT | SQ YD | 20,533.00 |
2360.501 | TYPE SP 9.5 WEARING COURSE MIX (2,C) | TON | 2,437.00 |
2363.509 | BITUMINOUS MATERIAL FOR MIXTURE | TON | 133.00 |
2540.602 | MAIL BOX SUPPORT | EACH | 21.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2563.601 | TRAFFIC CONTROL, SEAL COAT | LUMP SUM | 1.00 |
2563.601 | WORK ZONE SPEED LIMIT | LUMP SUM | 1.00 |
2580.603 | INTERIM PAVEMENT MARKING | LIN FT | 30,800.00 |
2580.603 | INTERIM PAVEMENT MARKING | LIN FT | 30,800.00 |
2582.502 | 24" SOLID LINE PREF TAPE GR IN | LIN FT | 38.00 |
2582.502 | 4" DBLE SOLID LINE EPOXY | LIN FT | 7,700.00 |
2582.502 | 6" SOLID LINE EPOXY | LIN FT | 15,400.00 |