- Project Number:
- CP 0411-153311 (Tied)
- Contract Number:
- 275030
- Other Project Numbers:
- CP 0411-153311 (Tied)
- Project Description:
- CP 0411-153311 (Tied) - Mill & Overlay
- Construction Location:
- City or Township:
- Bid Opening:
- 02/15/2018 10:00 AM
- Expected Award Date:
- 03/06/2018
- Project Start Date:
- 05/21/2018
- Construction Start Date:
- 05/21/2018
- Construction End Date:
- 08/15/2018
- Work Type:
- Bituminous
- Project Type:
- Road and Street
- Highest Funding Level:
- Local
- DBE Project:
- No
CP 0026-275030 (Low), SAP 069-626-012; CP 0026-275994 (Tied), SAP 069-626-013; CP 0411-153311 (Tied); CP 0526-298689 (Tied)
Bituminous Pavement Reclamation, Plant Mix Bituminous and Recycled Aggregate Surfacing, Bituminous Seal Coat, Bituminous Milling, Plant Mix Bituminous Surface and Aggregate Surfacing, Cold-In Place Reclamation, Plant Mix Bituminous Pavement and Bituminous Seal Coat
Project Major Items:
Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2104.505 | REMOVE BITUMINOUS PAVEMENT | SQ YD | 820.00 |
2118.501 | AGGREGATE SURFACING CLASS 5 | TON | 994.00 |
2123.507 | 0.5 CU YD SHOVEL | HOUR | 5.00 |
2231.501 | BITUMINOUS PATCHING MIXTURE | TON | 1,048.00 |
2232.501 | MILL BITUMINOUS SURFACE (1.0") | SQ YD | 69,053.00 |
2232.501 | MILL BITUMINOUS SURFACE (3.0") | SQ YD | 1,680.00 |
2357.502 | BITUMINOUS MATERIAL FOR TACK COAT | GALLON | 7,115.00 |
2360.501 | TYPE SP 9.5 WEARING COURSE MIX (2,C) | TON | 6,631.00 |
2540.602 | MAIL BOX SUPPORT | EACH | 14.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2563.601 | WORK ZONE SPEED LIMIT | LUMP SUM | 1.00 |
2580.603 | INTERIM PAVEMENT MARKING | LIN FT | 104,340.00 |
2582.502 | 24" SOLID LINE PREF TAPE GR IN | LIN FT | 103.00 |
2582.502 | 4" BROKEN LINE EPOXY | LIN FT | 210.00 |
2582.502 | 4" DBLE SOLID LINE EPOXY | LIN FT | 25,455.00 |
2582.502 | 4" SOLID LINE EPOXY | LIN FT | 1,050.00 |
2582.502 | 6" SOLID LINE EPOXY | LIN FT | 52,710.00 |