Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 0.44 |
2021.501 | MOBILIZATION | LUMP SUM | 0.56 |
2031.501 | FIELD OFFICE TYPE D | EACH | 1.00 |
2101.511 | CLEARING & GRUBBING | LUMP SUM | 1.00 |
2104.523 | SALVAGE SIGN | EACH | 9.00 |
2105.601 | DEWATERING | LUMP SUM | 1.00 |
2105.601 | ONE LANE BYPASS (14' LANE) | LUMP SUM | 1.00 |
2106.501 | EXCAVATION - COMMON | CU YD | 941.00 |
2106.521 | GRANULAR EMBANKMENT (CV) | CU YD | 593.00 |
2106.607 | SELECT GRANULAR EMBANKMENT MODIFIED 7% (CV) | CU YD | 768.00 |
2118.607 | AGGREGATE SURFACING (CV) CLASS 5 | CU YD | 440.00 |
2123.509 | DOZER | HOUR | 20.00 |
2401.501 | STRUCTURAL CONCRETE (3B52) | CU YD | 52.00 |
2401.512 | BRIDGE SLAB CONCRETE (3Y42-M) | SQ FT | 1,321.00 |
2401.513 | TYPE P-2 (TL-4) BARRIER CONCRETE (3S52) | LIN FT | 132.00 |
2401.541 | REINFORCEMENT BARS (EPOXY COATED) | POUND | 15,290.00 |
2401.541 | REINFORCEMENT BARS (STAINLESS-60KSI) | POUND | 300.00 |
2401.601 | SLOPE PREPARATION | LUMP SUM | 1.00 |
2401.601 | STRUCTURE EXCAVATION | LUMP SUM | 1.00 |
2402.584 | STRUCTURAL TUBE RAILING DESIGN T-1 | LIN FT | 120.00 |
2402.590 | ELASTOMERIC BEARING PAD TYPE 1 | EACH | 12.00 |
2405.502 | PRESTRESSED CONCRETE BEAMS 14RB | LIN FT | 248.00 |
2406.553 | BRIDGE APPROACH PANELS | SQ YD | 136.00 |
2442.501 | REMOVE EXISTING BRIDGE | LUMP SUM | 1.00 |
2452.520 | STEEL H-TEST PILE 110 FT LONG 12" | EACH | 2.00 |
2452.530 | PILE TIP PROTECTION 12" | EACH | 10.00 |
2452.603 | STEEL H-PILING 12" | LIN FT | 800.00 |
2502.502 | DRAINAGE SYSTEM TYPE (B910) | LUMP SUM | 1.00 |
2511.501 | RANDOM RIPRAP CLASS III | CU YD | 130.00 |
2511.501 | RANDOM RIPRAP CLASS III | CU YD | 290.00 |
2511.515 | GEOTEXTILE FILTER TYPE VII | SQ YD | 380.00 |
2511.515 | GEOTEXTILE FILTER TYPE VII | SQ YD | 600.00 |
2554.501 | TRAFFIC BARRIER DESIGN B8307 | LIN FT | 100.00 |
2554.501 | TRAFFIC BARRIER DESIGN SPECIAL | LIN FT | 100.00 |
2554.523 | END TREATMENT-TANGENT TERMINAL | EACH | 4.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 0.44 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 0.56 |
2564.536 | INSTALL SIGN PANEL TYPE C | EACH | 13.00 |
2573.502 | SILT FENCE, TYPE HI | LIN FT | 2,425.00 |
2573.505 | FLOTATION SILT CURTAIN TYPE MOVING WATER | LIN FT | 465.00 |
2573.550 | EROSION CONTROL SUPERVISOR | LUMP SUM | 1.00 |
2574.508 | FERTILIZER TYPE 3 | POUND | 105.00 |
2574.525 | COMMON TOPSOIL BORROW | CU YD | 134.00 |
2575.501 | SEEDING | ACRE | 0.30 |
2575.502 | SEED MIXTURE 36-311 | POUND | 21.00 |
2575.523 | EROSION CONTROL BLANKETS CATEGORY 3N | SQ YD | 2,395.00 |
2575.571 | RAPID STABILIZATION METHOD 3 | M GALLON | 1.20 |