Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2101.511 | CLEARING & GRUBBING | LUMP SUM | 1.00 |
2104.501 | REMOVE PIPE CULVERTS | LIN FT | 927.00 |
2104.513 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 704.00 |
2105.602 | TEMPORARY STREAM DIVERSION SYSTEM | EACH | 1.00 |
2105.604 | GEOTEXTILE FABRIC TYPE VI | SQ YD | 5,162.00 |
2105.607 | GRANULAR EMBANKMENT (CV) | CU YD | 66.00 |
2106.501 | EXCAVATION - COMMON | CU YD | 320.00 |
2106.607 | SELECT GRANULAR EMBANKMENT MODIFIED 7% (CV) | CU YD | 312.00 |
2130.501 | WATER | M GALLON | 18.00 |
2211.503 | AGGREGATE BASE (CV) CLASS 5 | CU YD | 1,189.00 |
2215.501 | FULL DEPTH RECLAMATION | SQ YD | 1,624.00 |
2360.501 | TYPE SP 12.5 WEARING COURSE MIX (2,C) | TON | 665.00 |
2412.511 | 8X6 PRECAST CONCRETE BOX CULVERT | LIN FT | 56.00 |
2412.512 | 8X6 PRECAST CONCRETE BOX CULV END SECT | EACH | 2.00 |
2451.501 | STRUCTURE EXCAVATION CLASS E | CU YD | 7,939.00 |
2451.503 | GRANULAR BACKFILL (CV) | CU YD | 4,456.00 |
2451.507 | GRANULAR BEDDING (CV) | CU YD | 503.00 |
2451.515 | COARSE AGGREGATE BEDDING (CV) | CU YD | 126.00 |
2501.511 | 24" RC PIPE CULVERT | LIN FT | 492.00 |
2501.511 | 36" RC PIPE CULVERT | LIN FT | 266.00 |
2501.515 | 24" RC PIPE APRON | EACH | 20.00 |
2501.515 | 36" RC PIPE APRON | EACH | 12.00 |
2501.521 | 44" SPAN RC PIPE-ARCH CULV CL IIA | LIN FT | 38.00 |
2501.525 | 44" SPAN RC PIPE-ARCH APRON | EACH | 2.00 |
2511.501 | RANDOM RIPRAP CLASS II | CU YD | 63.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2563.601 | WORK ZONE SPEED LIMIT | LUMP SUM | 1.00 |
2573.502 | SILT FENCE, TYPE HI | LIN FT | 1,730.00 |
2573.533 | SEDIMENT CONTROL LOG TYPE STRAW | LIN FT | 1,385.00 |
2573.550 | EROSION CONTROL SUPERVISOR | LUMP SUM | 1.00 |
2573.560 | CULVERT END CONTROLS | EACH | 16.00 |
2575.571 | RAPID STABILIZATION METHOD 3 | M GALLON | 3.00 |
2575.572 | RAPID STABILIZATION METHOD 4 | SQ YD | 6,350.00 |
2580.603 | INTERIM PAVEMENT MARKING | LIN FT | 797.00 |