Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2101.511 | CLEARING & GRUBBING | LUMP SUM | 1.00 |
2104.501 | REMOVE PIPE CULVERTS | LIN FT | 208.00 |
2104.513 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 227.00 |
2105.602 | TEMPORARY STREAM DIVERSION SYSTEM | EACH | 1.00 |
2105.604 | GEOTEXTILE FABRIC TYPE VI | SQ YD | 4,227.00 |
2105.607 | GRANULAR EMBANKMENT (CV) | CU YD | 450.00 |
2106.501 | EXCAVATION - COMMON | CU YD | 1,326.00 |
2106.607 | SELECT GRANULAR EMBANKMENT MODIFIED 7% (CV) | CU YD | 2,347.00 |
2130.501 | WATER | M GALLON | 12.00 |
2211.503 | AGGREGATE BASE (CV) CLASS 5 | CU YD | 1,042.00 |
2215.501 | FULL DEPTH RECLAMATION | SQ YD | 2,779.00 |
2360.501 | TYPE SP 12.5 WEARING COURSE MIX (2,C) | TON | 501.00 |
2412.511 | 8X6 PRECAST CONCRETE BOX CULVERT | LIN FT | 54.00 |
2412.512 | 8X6 PRECAST CONCRETE BOX CULV END SECT | EACH | 2.00 |
2451.501 | STRUCTURE EXCAVATION CLASS E | CU YD | 1,602.00 |
2451.503 | GRANULAR BACKFILL (CV) | CU YD | 903.00 |
2451.507 | GRANULAR BEDDING (CV) | CU YD | 99.00 |
2451.515 | COARSE AGGREGATE BEDDING (CV) | CU YD | 109.00 |
2501.511 | 24" RC PIPE CULVERT | LIN FT | 104.00 |
2501.511 | 36" RC PIPE CULVERT | LIN FT | 58.00 |
2501.515 | 24" RC PIPE APRON | EACH | 4.00 |
2501.515 | 36" RC PIPE APRON | EACH | 2.00 |
2501.521 | 28" SPAN RC PIPE-ARCH CULV CL IIA | LIN FT | 42.00 |
2501.525 | 28" SPAN RC PIPE-ARCH APRON | EACH | 2.00 |
2511.501 | RANDOM RIPRAP CLASS II | CU YD | 30.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2563.601 | WORK ZONE SPEED LIMIT | LUMP SUM | 1.00 |
2573.502 | SILT FENCE, TYPE HI | LIN FT | 2,190.00 |
2573.550 | EROSION CONTROL SUPERVISOR | LUMP SUM | 1.00 |
2573.560 | CULVERT END CONTROLS | EACH | 3.00 |
2575.571 | RAPID STABILIZATION METHOD 3 | M GALLON | 6.40 |
2575.572 | RAPID STABILIZATION METHOD 4 | SQ YD | 4,541.00 |
2580.603 | INTERIM PAVEMENT MARKING | LIN FT | 1,260.00 |