- Project Number:
- 24-04
- Contract Number:
- 24-04
- Other Project Numbers:
- Project Description:
- 185th Street Extension & CSAH 23 (Cedar Ave) and 185th Street Intersection Improvements Project
- Construction Location:
- City or Township:
- Lakeville
- Bid Opening:
- 01/13/2023 10:30 AM
- Expected Award Date:
- 02/06/2023
- Project Start Date:
- 02/20/2023
- Construction Start Date:
- 02/20/2023
- Construction End Date:
- 10/01/2023
- Work Type:
- Reconstruct
- Project Type:
- Road and Street
- Highest Funding Level:
- State
- DBE Project:
- No
The project involves extending 185th Street from CSAH 9 (Dodd Blvd) to Highview Avenue and the addition of a roundabout at the intersection of 185th Street and Highview Avenue, pedestrian underpasses under both the future segment of 185th Street and Highview Avenue. Traffic signal control will also be installed along with intersection improvements at the intersection of CSAH 23 (Cedar Ave) and 185th Street. Work includes grading, bituminous surfacing, full depth reclamation, storm sewer, drainage, watermain, signal revision, and ADA improvements. The majority of the work includes bituminous pavement removal, grading, Bituminous surfacing, concrete curb and gutter installation, storm sewer improvements, pond grading, and watermain improvements.
Project Major Items:
Number | Item | Units | Quantity |
---|
2106.507 | COMMON EMBANKMENT (CV) | CU YD | 158,723.00 |
2106.507 | EXCAVATION - COMMON | CU YD | 89,201.00 |
2360.509 | TYPE SP 12.5 WEARING COURSE MIXTURE (3,C) | TON | 8,025.00 |
2411.507 | STRUCTURAL CONCRETE (3G52) | CU YD | 144.00 |
2503.503 | 24" RC PIPE SEWER DESIGN 3006 CLASS IV | LIN FT | 775.00 |
2503.603 | 8" PVC PIPE SEWER (SDR 26) | LIN FT | 981.00 |
2531.503 | CONCRETE CURB AND GUTTER DESIGN B418 | LIN FT | 17,715.00 |