- Project Number:
- 009-606-037
- Contract Number:
- 1921
- Other Project Numbers:
- 009-606-037: SAP 009-606-037
- Project Description:
- SAP 009-606-037 BRIDGE #09503 MOOSE HORN RIVER REPLACE
- Construction Location:
- On CSAH 6 over the Moose Horn River in Barnum
- City or Township:
- Barnum, MN
- Bid Opening:
- 10/17/2022 1:00 PM
- Expected Award Date:
- 10/24/2022
- Project Start Date:
- 07/01/2023
- Construction Start Date:
- 07/01/2023
- Construction End Date:
- 10/23/2023
- Work Type:
- Bridge
- Project Type:
- Bridges
- Highest Funding Level:
- State
- DBE Project:
- No
Bridge Replacement over the Moose Horn River in Barnum, MN
Project Major Items:
Number | Item | Units | Quantity |
---|
2360.509/22305 | TYPE SP 12.5 NON WEAR COURSE MIX (2,C) | TON | 124.00 |
2401.503/07146 | TYPE MOD P-1 BARRIER CONC (3S52) | L F | 216.00 |
2401.507/03643 | STRUCTURAL CONCRETE (3B52) | C Y | 154.00 |
2401.601/00010 | STRUCTURE EXCAVATION | LS | 1.00 |
2442.501/00010 | REMOVE EXISTING BRIDGE | LS | 1.00 |
2452.603/06120 | C-I-P CONCRETE PILING 12" | L F | 1,320.00 |
2504.601/00016 | WATERMAIN HANGER SYSTEM | LS | 1.00 |
2511.509/00013 | RANDOM RIPRAP CLASS III | TON | 693.00 |