- Project Number:
- T42.120675
- Contract Number:
- T42.120675
- Other Project Numbers:
- STBG 1822 (215); SP 01805-84; SP 230-107-003; SP 230-121-001
- Project Description:
- TH 210/Inglewood Drive project consist of moving an existing BNSF RR crossing and signal on TH 210 to better align with existing streets. The existing crossing at Knollwood Drive will be removed and the signal will be replaced with a RCI Intersection.
- Construction Location:
- TH 210 / INGLEWOOD DR AND TH 21 / KNOLLWOOD DRIVE
- City or Township:
- BAXTER
- Bid Opening:
- 08/01/2022 11:00 AM
- Expected Award Date:
- 08/16/2022
- Project Start Date:
- 09/07/2022
- Construction Start Date:
- 09/15/2022
- Construction End Date:
- 08/19/2023
- Work Type:
- Bituminous
- Project Type:
- Specialized Construction
- Highest Funding Level:
- Federal
- DBE Project:
- Yes
TH 210/Inglewood Drive project consist of moving an existing BNSF railroad crossing and signal on TH 210 to better align with existing streets. The existing crossing at Knollwood Drive will be removed and the signal will be replaced with a Restricted Crossing Intersection (RCI) design.
Project Major Items:
Number | Item | Units | Quantity |
---|
| 12" - 18" Storm Sewer Pipe | LIN FT | 515.00 |
| Aggregate Base, Class 6 (CV) | CU YD | 1,427.00 |
| Bituminous Pavmeent | TON | 1,877.00 |
| Common Excavation | CU YD | 5,831.00 |
| Concrete Curb & Gutter | LN FT | 2,560.00 |
| Concrete Median | SQ YD | 1,130.00 |
| Construct Drainage Structure | LIN FT | 40.00 |
| Lighting Unit Type 9-40 | EA | 10.00 |
| Multi-Component GR-IN (WR) Markings | LIN FT | 15,000.00 |
| Solid Line Paint | LIN FT | 800.00 |
| Traffic Control | LS | 1.00 |
| Traffic Control Signal System | LS | 1.00 |
| Turf Restoration | ACRES | 3.00 |
| Weed Spraying | ACRES | 2.00 |