- Project Number:
- 01-2022
- Contract Number:
- 01-2022
- Other Project Numbers:
- SAP 041-030-017, 041-607-051, 041-608-038, 041-613-026, 041-624-005, 041-625-008
- Project Description:
- Stabilized Full Depth Reclamation, Bituminous Paving, and Shouldering
- Construction Location:
- 041-607-051 CSAH 1 between TH 19 & CSAH 17 (Length 3.002 Mi.)
041-608-038 CSAH 8 between CSAH 11 & CSAH 13 (Length 2.007 Mi.)
041-613-026 CSAH 13 between CSAH 8 & the East Co. Line (Length 2.005 Mi.)
041-624-005 CSAH 24 between Garfield Street & Railroad Street (Length 0.139)
041-625-008 CSAH 25 between TH 75 & Railroad St. (Length 0.883 Mi.)
041-030-017- CSAH 1, 5, 7, 13, 15, & 17 (Length 3.994 Mi.)
- City or Township:
- Bid Opening:
- 06/06/2022 2:00 PM
- Expected Award Date:
- 06/07/2022
- Project Start Date:
- 06/27/2022
- Construction Start Date:
- 07/05/2022
- Construction End Date:
- 09/30/2022
- Work Type:
- Bituminous
- Project Type:
- Road and Street
- Highest Funding Level:
- State
- DBE Project:
- No
Lincoln County, MN
ADVERTISEMENT FOR BIDS
CLOSING DATE: Monday, June 6th, 2022
NOTICE is hereby given that SEALED BIDS will be received for County Project No. 01-2022 by the Lincoln County Auditor in Ivanhoe, MN until 2:00 PM on Monday, June 6th, 2022. Work includes 12.259 miles of Aggregate Shouldering and Bituminous Surfacing along with 3.0 miles of Stabilized Full Depth Reclamation. Copies of the plans, specifications and full ad details may be downloaded from the Lincoln County website, www.co.lincoln.mn.us, or by calling the Lincoln County Highway Department at 507-694-1464.
SS / Deb Vierhuf
Lincoln County Auditor-Treasurer
Project Major Items:
Number | Item | Units | Quantity |
---|
2215.504 | STABILIZED FULL DEPTH RECLAMATION | SQ YD | 42,267.00 |
2221.509 | SHOULDER BASE AGGREGATE CLASS 1 | TON | 1,557.00 |
2232.504 | MILL BITUMINOUS SURFACE | SQ YD | 2,394.00 |
2360.509 | TYPE SP 12.5 WEARING COURSE MIXTURE (2,B) | TON | 7,240.00 |
2360.509 | TYPE SP 12.5 WEARING COURSE MIXTURE (2,C) | TON | 9,669.00 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) | TON | 3,373.00 |
2582.503 | 4" SOLID LINE PAINT | LIN FT | 172,741.00 |