- Project Number:
- SAP 039-594-002
- Contract Number:
- 20225
- Other Project Numbers:
- Project Description:
- Road reconstruction and water and sanitary replacement.
- Construction Location:
- Main Avenue NW, Third Street NE, Third Ave NE, and Third Street SW
- City or Township:
- Baudette
- Bid Opening:
- 04/11/2022 2:00 PM
- Expected Award Date:
- 04/11/2022
- Project Start Date:
- 05/25/2022
- Construction Start Date:
- 06/01/2022
- Construction End Date:
- 09/30/2022
- Work Type:
- Water Main/Storm Sewer/Sanitary Sewer
- Project Type:
- Road and Street
- Highest Funding Level:
- Local
- DBE Project:
- No
Common Excavation 6,328 CY
Granular Embankment 4,648 CY
Aggregate Base Class V 3,103 Ton
4” Concrete Walk 6,085 SF
Type SP 12.5 Asphalt 808 Ton
B618 Curb and Gutter 2,286 LF
Sanitary Sewer Pipe – Size Varies 1,650 LF
8” Watermain 800 LF
Project Major Items:
Number | Item | Units | Quantity |
---|
| 4" Concrete Walk | SF | 6,085.00 |
| 8" Watermain | LF | 800.00 |
| Aggregate Base Class V | TON | 3,103.00 |
| B618 Curb and Gutter | LF | 2,286.00 |
| Common Excavation | CY | 6,328.00 |
| Granular Embankment | CY | 4,648.00 |
| Sanitary Sewer Pipe | LF | 1,650.00 |
| Type SP 12.5 Asphalt | TON | 808.00 |