Project Number:
SAP 040-603-030, 040-603-031, 040-626-047
Contract Number:
Other Project Numbers:
Project Description:
Mill, Stabilized Full Depth Reclamation, Bituminous Overlay, and ADA Pedestrian Ramps.
Construction Location:
CSAH 3 (two locations) & CSAH 26
City or Township:
Bid Opening:
04/05/2022 1:00 PM
Expected Award Date:
04/19/2022
Project Start Date:
06/06/2022
Construction Start Date:
06/06/2022
Construction End Date:
09/30/2022
Work Type:
Bituminous
Project Type:
Road and Street
Highest Funding Level:
State
DBE Project:
No
NOTICE

NOTICE TO CONTRACTORS - Sealed bids will be received until 1:00 p.m., Tuesday, April 5th, 2022 by Danielle Blaschko, County Auditor of Le Sueur County, 88 South Park Avenue, Le Center, Minnesota on behalf of the County Board of Commissioners for the Mill, Stabilized Full Depth Reclamation, Bituminous Overlay, and ADA Pedestrian Ramps Projects on CSAH 3 (2 locations), & CSAH 26: SAP 040-603-030, SAP 040-603-031, and SAP 040-626-047. Total Project Length of 6.53 miles.
The approximate major quantities are as follows:
Class 1 Aggregate Shouldering 8100 Tons
Class 2 Aggregate Shouldering 950 Tons
Class 5 Aggregate Base 10250 Tons
2360 Plant Mixed Bituminous 29510 Tons
Traffic Control 3 Lump Sum
Milled Bit. Surface Several Depths 23553 Sq. Yd.
4" Solid & Broken Line Traffic Paint 344 Gallons
Full Depth Reclamation 98668 Sq. Yd.
Stabilized Full Depth Reclamation (Cement) 92760 Sq. Yd.
4” Perf. PE Edge Drain 53166 Lin. Ft.
Adjust Gate Valve Box and Ring Casting 36 Each
4” Concrete Walk 1793 Sq. Ft.
Concrete Curb & Gutter B618 & B24 423 Lin. Ft.
Truncated Dome 138.6 Sq. Ft.
Various Diameter Pipe Lining 254 Lin. Ft.
Turf Establishment 2 Lump Sum

Proposals, plans, and specifications may be examined and obtained at the County Highway Engineer's Office, 88 South Park Avenue, Le Center, Minnesota 56057, telephone 507-357-8210. The price of plans is $25.00. A certified check or a corporate surety bond, made payable to the Treasurer of Le Sueur County, must accompany bids in an amount of not less than five percent (5%) of total bid.

The County Board reserves the right to reject any or all bids and to waive any defects therein.

Danielle Blaschko
County Auditor
Le Sueur County, Minnesota
• Please publish for three (3) consecutive weeks as a legal ad, starting with the week of your March 10th, 2022 publication.
• Billing Address: Le Sueur County Highway Department
88 South Park Avenue
Le Center, MN 56057
Attn: Colleen Baker
507-357-8210
• Please provide our office with an affidavit of publication.
Project Major Items:
NumberItemUnitsQuantity
2360 Plant Mixed BituminousTons29,510.00
4" Concrete WalkSq. Ft.1,793.00
4" Perf. PE Edge DrainLin. Ft.53,166.00
4" Solid & Broken Line Traffic PaintGal344.00
Adjust Gate Valve Box & Ring CastingEach36.00
CL 1 Agg ShoulderingTons8,100.00
CL 2 Agg ShoulderingTons950.00
CL 5 Agg BaseTons10,250.00
Concrete Curb & Gutter B618 & B624Lin. Ft.423.00
Full Depth ReclamationSq. Yd.98,668.00
Milled Bit. Surface Several DepthsSq. Yd.23,553.00
Stabilized FDR CementSq. Yd.92,760.00
Traffic ControlLump Sum3.00
Truncated DomeSq. Ft.138.60
Turf EstablishmentLump Sum2.00
Various Diameter Pipe LiningLin. Ft.254.00
Project Owner:

Le Sueur County Highway
88 South Park Ave
Le Center, MN   56057
(507) 357-8210
(507) 357-4520
nolson@co.le-sueur.mn.us
Project Engineer:

Nathan Olson
88 South Park Ave
Le Center, MN   56057
(507) 357-8211
nolson@co.le-sueur.mn.us