Minnesota County Engineers Association City Engineers Association of Minnesota Minnesota Department of Transportation
Home | Advanced Search | FAQ | Bid Calendar | Privacy Policy |
rss feed icon rss feed icon

Project Number:
OW1-123025
Contract Number:
OW1-123025
Other Project Numbers:
S.P. 8611-30
Project Description:
The City of Annandale, along with MnDOT Dist 3, is about to implement a roundabout on TH 24 at Hemlock Street, along with misc road construction from Poplar Ave to north of Hemlock Street.
Construction Location:
TH 24 (Park Ave) from Poplar Ave to Hemlock Street
City or Township:
Annandale
Bid Opening:
03/08/2022 1:00 PM
Expected Award Date:
03/14/2022
Project Start Date:
04/01/2022
Construction Start Date:
06/06/2022
Construction End Date:
10/15/2022
Work Type:
Bituminous
Project Type:
Road and Street
Highest Funding Level:
State
DBE Project:
No
The City of Annandale, in cooperation with Minnesota Department of Transportation Dist 3, is about to implement a roundabout on TH 24 at Hemlock Street, a southbound 3/4-left turn intersection at the elementary school entrance and perform associated grading and bituminous surfacing construction along and adjacent to Trunk Highway No. 24 from Poplar Ave to north of Hemlock Street under State Project no. 8611-30 (T.H. 24 =240).
Project Owner:

City of Annandale
30 Cedar St E
Annandale, MN   55302
(320) 274-3055
(320) 274-5728
city@annandale.mn.us
Project Engineer:

Jared Voge
2040 Hwy 12 East
Willmar, MN   56201
(612) 756-0326
(320) 231-9710
jaredvo@bolton-menk.com
Jared Voge