- Project Number:
- 064-606-038
- Contract Number:
- 22-3
- Other Project Numbers:
- Project Description:
- CSAH 6 CIR, Bituminous Overlay
- Construction Location:
- On CSAH 6 in Redwood County between the Jct. TH 68 in Wabasso to the Jct. TH 19/67
- City or Township:
- Bid Opening:
- 02/22/2022 1:00 PM
- Expected Award Date:
- 03/01/2022
- Project Start Date:
- 05/01/2022
- Construction Start Date:
- 05/01/2022
- Construction End Date:
- 08/01/2022
- Work Type:
- Mill and Overlay
- Project Type:
- Road and Street
- Highest Funding Level:
- Local
- DBE Project:
- No
TYPE OF WORK: CIR (Cold In-Place Recycle), Bituminous Overlay, Aggregate Shoulders, and Striping.
Project Major Items:
Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LS | 1.00 |
2215.509 | BITUMINOUS MATERIAL FOR MIXTURE | TON | 598.50 |
2221.509 | SHOULDER BASE AGGREGATE CLASS 1 | TON | 14,550.00 |
2232.504 | MILL BITUMINOUS SURFACE (2.0") | S Y | 6,671.00 |
2232.504 | MILL BITUMINOUS SURFACE (3.0") | S Y | 4,169.00 |
2360.509 | TYPE SP 12.5 WEARING COURSE MIXTURE (2,C) | TON | 34,030.00 |
2390.504 | COLD-IN-PLACE RECYCLED / COLD CENTRAL PLANT RECYCLING BITUMINOUS | S Y | 153,488.00 |
2502.502 | 4" PRECAST CONCRETE HEADWALL | EACH | 152.00 |
2502.503 | 4" PERF PE PIPE DRAIN | L F | 105,952.00 |
2502.503 | 4" TP PIPE DRAIN | L F | 1,824.00 |
2563.601 | TRAFFIC CONTROL | LS | 1.00 |
2574.609 | COMMON TOPSOIL BORROW | TON | 191.00 |
2575.523 | RAPID STABILIZATION METHOD 3 | MGAL | 2.02 |
2582.503 | 4" BROKEN LINE PAINT | L F | 10,023.00 |
2582.503 | 4" SOLID LINE PAINT | L F | 151,260.00 |