- Project Number:
- Project: Z88
- Contract Number:
- Project: Z88
- Other Project Numbers:
- Z88 Various
- Project Description:
- 2021 State Aid Bituminous Resurfacing Project
- Construction Location:
- Various Locations
- City or Township:
- Marshall
- Bid Opening:
- 04/09/2021 10:00 AM
- Expected Award Date:
- 04/13/2021
- Project Start Date:
- 05/03/2021
- Construction Start Date:
- 05/03/2021
- Construction End Date:
- 09/02/2022
- Work Type:
- Mill and Overlay
- Project Type:
- Road and Street
- Highest Funding Level:
- State
- DBE Project:
- No
The City of Marshall, Minnesota will receive electronic bids only via BidVAULT until 10:00 a.m. (local time) on Friday, April 9, 2021, for the following project in MARSHALL, MINNESOTA:
PROJECT Z88: 2021 BITUMINOUS RESURFACING ON VARIOUS STATE AID CITY STREETS
Prospective bidders must register as a Plan Holder to download plans and specifications. All bids shall be made electronically via BidVAULT and shall be accompanied by a cash deposit, cashier's check, bid bond or certified check, payable to the order of the City for not less than 10% of the bid. Instructions on submitting a bid electronically via BidVAULT can be found at the following: https://rtvision.atlassian.net/wiki/spaces/ONE/pages/12091421/Contractor+Guides. The cost to submit a bid is $25 plus a 3rd party payment processing fee.
A copy of the full Advertisement for Bid, Plans, and Specifications for this project can be found through the City of Marshall’s eGram website at https://egram.ci.marshall.mn.us. For any questions regarding this project, please contact Jessie Dehn, Assistant City Engineer, at Jessie.Dehn@ci.marshall.mn.us or 507-537-6773.
Jason R. Anderson, P.E.
Public Works Director/City Engineer
Project Major Items:
Number | Item | Units | Quantity |
---|
2104.518/00190 | REMOVE PAVEMENT | S F | 21,030.00 |
2232.604 | MILL BITUMINOUS PAVEMENT (1.5") | S Y | 123,217.00 |
2360.609 | TYPE SP 9.5 WEARING COURSE MIX (3,B) | TON | 16,298.00 |
2521.618 | 4" CONCRETE WALK | S F | 6,859.00 |
2521.618 | 6" CONCRETE WALK | S F | 6,865.00 |
2531.603 | CONCRETE CURB & GUTTER DESIGN B618 | L F | 2,305.00 |