- Project Number:
- Project: Z78
- Contract Number:
- Project: Z78
- Other Project Numbers:
- Z78
- Project Description:
- Storm Structure Outfall Improvements
- Construction Location:
- Various Locations
- City or Township:
- Marshall
- Bid Opening:
- 04/02/2021 10:00 AM
- Expected Award Date:
- 04/13/2021
- Project Start Date:
- 04/19/2021
- Construction Start Date:
- 04/19/2021
- Construction End Date:
- 11/05/2021
- Work Type:
- Pipe and Culvert
- Project Type:
- Sewer and Water
- Highest Funding Level:
- Local
- DBE Project:
- No
The City of Marshall, Minnesota will receive electronic bids only via BidVAULT until 10:00 a.m. (local time) on Friday, April 2, 2021, for the following project in MARSHALL, MINNESOTA:
PROJECT Z78: This project consists of the following: Installation of stormwater manholes on South Saratoga Street south of Continental Street and adjacent to the north bank of the Redwood River Diversion Channel approximately 800 feet east of US 59. This project will also include installation of a check valve and turf restoration.
Prospective bidders must register as a Plan Holder to download plans and specifications. All bids shall be made electronically via BidVAULT and shall be accompanied by a cash deposit, cashier's check, bid bond or certified check, payable to the order of the City for not less than 10% of the bid. Instructions on submitting a bid electronically via BidVAULT can be found at the following: https://rtvision.atlassian.net/wiki/spaces/ONE/pages/12091421/Contractor+Guides. The cost to submit a bid is $25 plus a 3rd party payment processing fee.
A copy of the full Advertisement for Bid, Plans, and Specifications for this project can be found through the City of Marshall’s eGram website at https://egram.ci.marshall.mn.us. For any questions regarding this project, please contact Jessie Dehn, Assistant City Engineer, at Jessie.Dehn@ci.marshall.mn.us or 507-537-6773.
Jason R. Anderson, P.E.
Public Works Director/City Engineer
Project Major Items:
Number | Item | Units | Quantity |
---|
2501.602 | CHECK VALVE FOR 30" HDPE PIPE | EACH | 1.00 |
2506.503/03020 | CONST DRAINAGE STRUCTURE DES 60-4020 | L F | 10.40 |
2506.503/04220 | CONST DRAINAGE STRUCTURE DES 84-4020 | L F | 14.40 |