- Project Number:
- 20-07
- Contract Number:
- 20-07
- Other Project Numbers:
- 20-07
- Project Description:
- RCD Storm Sewer Ditch Replacement and Trail
- Construction Location:
- 2660 Civic Center Dr
- City or Township:
- Roseville
- Bid Opening:
- 03/15/2021 2:00 PM
- Expected Award Date:
- 03/22/2021
- Project Start Date:
- 04/01/2021
- Construction Start Date:
- 04/01/2021
- Construction End Date:
- 10/16/2021
- Work Type:
- Pipe and Culvert
- Project Type:
- Drainage
- Highest Funding Level:
- Local
- DBE Project:
- No
The contract for this project consists of two plan sets: Ramsey County Ditch 4 Pipe Installation and Twin Lakes Trail Improvements.
The Ramsey County Ditch 4 Pipe Installation plans consist of replacing an open ditch with an 84 inch storm sewer pipe, related drainage structures, and mass grading. The work for these items is described and included in the Ramsey County Ditch 4 Pipe Installation Plans and Specifications.
The Twin Lakes Trail Improvements plans consist of the installation of a bituminous trail, final grading, lighting installation, landscaping, and turf establishment. The work for these items is described and included in the Twin Lakes Trail Improvements Plan and Specifications.
Project Major Items:
Number | Item | Units | Quantity |
---|
2106.507/00131 | COMMON EMBANKMENT (LV) | C Y | 31,290.00 |
2211.507/00170 | AGGREGATE BASE (CV) CLASS 5 | C Y | 537.00 |
2360.504/13230 | TYPE SP 9.5 WEAR CRS MIX(3;B) 3.0" THICK | S Y | 2,457.00 |
2503.503/15845 | 84" RC PIPE SEWER CLASS V | L F | 2,438.00 |
2545.502/00101 | LIGHTING UNIT TYPE SPECIAL 1 | EACH | 19.00 |
2571.524/12250 | DECIDUOUS TREE 2.5" CAL B&B | TREE | 83.00 |
2575.504/00073 | EROSION CONTROL BLANKETS CATEGORY 3N | S Y | 2,500.00 |