Minnesota County Engineers Association City Engineers Association of Minnesota State Aid for Local Transportation
Home | Advanced Search | FAQ | Bid Calendar | Privacy Policy |
rss feed icon rss feed icon

Project Number:
MORRC 150439
Contract Number:
300
Other Project Numbers:
TA 4921 (139) 049-639-014 049-591-005
Project Description:
2021 CSAH 43 & 39 Reconstruction and Safe Routes to School, Pierz, MN
Construction Location:
3RD AVE NORTH (CSAH 39 & 43) FROM CENTENNIAL DR IN PIERZ TO KAMNIC ST
City or Township:
Pierz
Bid Opening:
03/25/2021 10:00 AM
Expected Award Date:
04/06/2021
Project Start Date:
04/21/2021
Construction Start Date:
04/21/2021
Construction End Date:
10/15/2021
Work Type:
Water Main/Storm Sewer/Sanitary Sewer
Project Type:
Sewer and Water
Highest Funding Level:
Federal
DBE Project:
Yes
NOTICE is hereby given that SEALED BIDS will be received by the Morrison County Engineer at 1208 West River Road in Little Falls, Minnesota until 10:00 a.m. on Thursday, March 25, 2021 for the following project: 2021 CSAH 43 & 39 Reconstruction and Safe Routes to School, Pierz, Minnesota

PROJECT NO. SP 049-591-005, SAP 049-639-014 & SAP 049-643-017, MINN. PROJ. NO. TA 4921 (139)
SEH No. MORRC 150439
CONTRACT NO. 300

LOCATION: 3RD AVE NORTH (CSAH 39 & 43) FROM CENTENNIAL DR IN PIERZ TO KAMNIC ST

TYPE OF WORK: SANITARY SEWER, WATER MAIN, STORM SEWER, STREET & SIDEWALK RECONSTRUCTION, OVERLAY, BITUMINOUS AND CONCRETE MUTI-USE TRAIL, AND PEDESTRIAN CROSSINGS

Bids shall be on the form provided for that purpose and according to the Bidding Requirements prepared by Short Elliott Hendrickson Inc. (SEH) dated January 7, 2021.

The Bidding Documents may be examined at the Morrison County Engineer's Office at 1208 West River Road, Little Falls, MN 56345.

The Bidding Documents may be viewed for no cost at http://www.sehinc.com by selecting the Project Bid Information link at the bottom of the page and the View Plans option from the menu at the top of the selected project page.

Digital image copies of the Bidding Documents are available at http://www.sehinc.com for a fee of $30. These documents may be downloaded by selecting this project from the PROJECT BID INFORMATION link and by entering eBidDocTM Number 7603905 on the SEARCH PROJECTS page. For assistance and free membership registration, contact QuestCDN at 952.233.1632 or info@questcdn.com.

In addition to digital plans, Paper copies of the Bidding Documents may be obtained from Docunet Corp. located at 2435 Xenium Lane North, Plymouth, MN 55441 (763.475.9600) for a fee of $100.

Bids will only be accepted from Contractors who purchase Bidding Documents as noted above.

Minimum wage rates to be paid by the Contractors have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581 and implementing regulations.

A minimum goal of 5.1% Good Faith Effort to be subcontracted to Disadvantaged Business Enterprises.

Bids must be accompanied by a Bid Bond or Certified Check (Bid security) in an amount equal to at least 5% of the total bid made payable to Morrison County Public Works. Bid security may be retained until the contract has been awarded and executed, but not longer than 60 calendar days from the date of opening bids. No bidder may withdraw their bid for a period of 60 calendar days after the bid opening.

A Contractor responding to these Bidding Documents must submit to the County a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minnesota Statutes, section 16C.285, subdivision 3.

Bids shall be directed to the Morrison County Engineer, securely sealed and endorsed upon the outside wrapper, BID FOR 2021 CSAH 43 & 39 RECONSTRUCTION AND SAFE ROUTES TO SCHOOL, PIERZ MN, MORRC 150439, SAP NOS. 049-643-017, 049-639-014; SP No. 049-591-005; Minn. Proj. No. TA 4921 (139).

The County reserves the right to reject any and all Bids, to waive irregularities and informalities thereof.
Project Major Items:
NumberItemUnitsQuantity
12-Inch – 27-Inch RCP Storm SewerLIN FT3,830.00
8-Inch ReclamationSQ YD20,400.00
Aggregate Base Class 5CU YD2,015.00
BituminousTON6,050.00
Channel and Pond ExcavationCU YD4,000.00
Common ExcavationCU YD8,470.00
Concrete Curb & GutterLIN FT8,340.00
Concrete DrivewaySQ YD900.00
Concrete WalkSQ FT14,000.00
Drainage StructuresEACH46.00
GrubbingTREE47.00
Lighting Unit Type SpecialEACH21.00
PE Water ServiceLIN FT1,180.00
PVC Sanitary Service PipeLIN FT890.00
PVC Sanitary SewerLIN FT1,585.00
PVC WatermainLIN FT3,570.00
Remove Bituminous PavementSQ YD1,100.00
Remove Concrete PavementSQ YD1,340.00
Remove Curb & GutterLIN FT8,180.00
Remove Drainage StructureEACH27.00
Remove Sanitary ManholeEACH11.00
Remove Sanitary SewerLIN FT1,640.00
Remove Storm SewerLIN FT2,810.00
Remove Water MainLIN FT3,460.00
Salvage AggregateCU YD6,120.00
Sanitary StructuresEACH11.00
SeedingACRE2.90
Select Granular BorrowCU YD11,610.00
StripingLIN FT11,480.00
Subgrade ExcavationCU YD11,290.00
Project Owner:

Steven Backowski, PE
213 1st Avenue SE
Little Falls, MN   56345
(320) 632-0121
steveb@co.morrison.mn.us
Project Engineer:

Scott Hedlund
1200 25th Avenue South
PO Box 1717
St. Cloud, MN   56302-1717
(320) 229-4335
shedlund@sehinc.com