- Project Number:
- LFPH8A-21
- Contract Number:
- Other Project Numbers:
- Project Description:
- LFPH8A-21, 2021 Phase 8A Liner Construction at Kandiyohi County Landfill.
- Construction Location:
- Kandiyohi County Landfill
15650 Highway 71 NE
- City or Township:
- New London
- Bid Opening:
- 03/16/2021 10:00 AM
- Expected Award Date:
- 04/06/2021
- Project Start Date:
- 04/12/2021
- Construction Start Date:
- 04/12/2021
- Construction End Date:
- 11/01/2021
- Work Type:
- Excavation
- Project Type:
- Specialized Construction
- Highest Funding Level:
- Local
- DBE Project:
- No
The Work includes construction of a 3.4-acre Municipal Solid Waste Landfill liner with 2-feet of select clay and 155,000 SF 60mil HDPE. Related work includes strip 11 acres of topsoil 10,200 CY of contractor sourced soil imports; 200 linear feet of underground electric; 2600 linear feet of HDPE landfill pipe; install leachate pump and controls; place 42,800 CY of frost protection; excavate and backfill approximately 10,000 cubic yards of engineered soil material for road construction, SWPPP and site restoration. The substantial completion date is November 1, 2021.