Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2101.501 | CLEARING & GRUBBING | LUMP SUM | 1.00 |
2104.503 | REMOVE PIPE CULVERTS | LIN FT | 538.00 |
2104.503 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 448.00 |
2105.504 | GEOTEXTILE FABRIC TYPE 6 | SQ YD | 2,520.00 |
2118.507 | AGGREGATE SURFACING (CV) CLASS 5 | CU YD | 54.00 |
2123.510 | 0.5 CU YD SHOVEL | HOUR | 9.00 |
2123.510 | MOTOR GRADER | HOUR | 9.00 |
2130.523 | WATER | M GALLON | 9.00 |
2211.507 | AGGREGATE BASE (CV) CLASS 5 | CU YD | 491.00 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIX (2;C) | TON | 300.00 |
2411.507 | GRANULAR BACKFILL (CV) | CU YD | 2,643.00 |
2451.507 | GRANULAR BEDDING (CV) | CU YD | 223.00 |
2451.507 | STRUCTURE EXCAVATION CLASS E | CU YD | 3,635.00 |
2501.502 | 24" RC PIPE APRON | EACH | 16.00 |
2501.502 | 36" RC PIPE APRON | EACH | 2.00 |
2501.503 | 24" RC PIPE CULVERT DES 3006 CL III | LIN FT | 432.00 |
2501.503 | 36" RC PIPE CULVERT DES 3006 CL III | LIN FT | 72.00 |
2511.507 | RANDOM RIPRAP CLASS II | CU YD | 23.60 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2563.601 | WORK ZONE SPEED LIMIT | LUMP SUM | 1.00 |
2573.501 | EROSION CONTROL SUPERVISOR | LUMP SUM | 1.00 |
2573.502 | CULVERT END CONTROLS | EACH | 9.00 |
2573.503 | SEDIMENT CONTROL LOG TYPE STRAW | LIN FT | 1,380.00 |
2575.504 | RAPID STABILIZATION METHOD 4 | SQ YD | 2,449.00 |