Number | Item | Units | Quantity |
---|
2021.501 | MOBILIZATION | LUMP SUM | 1.00 |
2101.501 | CLEARING & GRUBBING | LUMP SUM | 1.00 |
2104.503 | REMOVE PIPE CULVERTS | LIN FT | 964.00 |
2104.503 | SAWING BIT PAVEMENT (FULL DEPTH) | LIN FT | 816.00 |
2105.504 | GEOTEXTILE FABRIC TYPE 6 | SQ YD | 4,180.00 |
2106.507 | EXCAVATION - COMMON | CU YD | 781.00 |
2106.507 | SELECT GRANULAR EMBANKMENT MOD 7% (CV) | CU YD | 608.00 |
2118.507 | AGGREGATE SURFACING (CV) CLASS 5 | CU YD | 87.00 |
2123.510 | 0.5 CU YD SHOVEL | HOUR | 17.00 |
2123.510 | MOTOR GRADER | HOUR | 17.00 |
2130.523 | WATER | M GALLON | 17.00 |
2211.507 | AGGREGATE BASE (CV) CLASS 5 | CU YD | 1,017.00 |
2360.509 | TYPE SP 12.5 NON WEAR COURSE MIX (2;C) | TON | 172.00 |
2360.509 | TYPE SP 9.5 WEARING COURSE MIX (2;C) | TON | 695.00 |
2411.507 | GRANULAR BACKFILL (CV) | CU YD | 3,712.00 |
2451.507 | COARSE FILTER AGGREGATE (CV) | CU YD | 20.00 |
2451.507 | GRANULAR BEDDING (CV) | CU YD | 405.00 |
2451.507 | STRUCTURE EXCAVATION CLASS E | CU YD | 6,664.00 |
2501.502 | 24" RC PIPE APRON | EACH | 16.00 |
2501.502 | 28" SPAN RC PIPE-ARCH APRON | EACH | 8.00 |
2501.502 | 44" SPAN RC PIPE-ARCH APRON | EACH | 8.00 |
2501.503 | 24" RC PIPE CULVERT DES 3006 CL III | LIN FT | 428.00 |
2501.503 | 28" SPAN RC PIPE-ARCH CULV CL IIA | LIN FT | 162.00 |
2501.503 | 44" SPAN RC PIPE-ARCH CULV CL IIA | LIN FT | 178.00 |
2502.503 | 12" PERF PVC PIPE DRAIN | LIN FT | 100.00 |
2563.601 | TRAFFIC CONTROL | LUMP SUM | 1.00 |
2563.601 | WORK ZONE SPEED LIMIT | LUMP SUM | 1.00 |
2573.501 | EROSION CONTROL SUPERVISOR | LUMP SUM | 1.00 |
2573.502 | CULVERT END CONTROLS | EACH | 16.00 |
2573.503 | SEDIMENT CONTROL LOG TYPE STRAW | LIN FT | 2,627.00 |
2575.504 | RAPID STABILIZATION METHOD 4 | SQ YD | 3,529.00 |