- Project Number:
- 1-2021
- Contract Number:
- 1-2021
- Other Project Numbers:
- SP 008-613-030
- Project Description:
- 1-2021
- Construction Location:
- CSAH 13 between 220th St and Hanska
- City or Township:
- Bid Opening:
- 02/24/2021 10:00 AM
- Expected Award Date:
- 03/02/2021
- Project Start Date:
- 06/07/2021
- Construction Start Date:
- 06/07/2021
- Construction End Date:
- 09/06/2021
- Work Type:
- Surfacing
- Project Type:
- Road and Street
- Highest Funding Level:
- Federal
- DBE Project:
- Yes
*COUNTY PROJECTS*
BIDS CLOSE February 24, 2021
BROWN COUNTY, MN
NOTICE TO CONTRACTORS-
Notice is hereby given that the Board of Commissioners, Brown County; New Ulm, MN will accept sealed bids, at the Office of the County Administrator, in the Brown County Courthouse, New Ulm, MN. until 10:00 a.m. on the 24th day of February, 2021, for the following project(s):
• S.P. 008-613-030 & S.P. 008-070-006 Concrete Overlay, 2 Foot Paved Shoulder, Edge Rumble, Safety Edge and Aggregate Shoulders on CSAH 13 located between Hanska and 220th Street.
Major quantities include: 1 L.S. Construction Surveying; 1 L.S. Mobilization; 24,000 Tons Aggregate Shoulder Class 1; 1670 S.Y. Full Depth Reclamation; 133,960 S.Y. Mill Bituminous Surface; 42,900 L.F. Milled Rumble Strips (Concrete); 856 Each Dowel Bar; 149,300 S.Y. Place Concrete Pavement 6 Inches; 4360 S.Y. Place Concrete Pavement 8 Inches; 30,000 C.Y. Structural Concrete; 790 Each Drill & Grout Reinforcement Bar (Epoxy Coated); 90,500 L.F. Concrete Safety Edge; 5400 Gal. Bituminous Material For Shoulder Tack; 1600 Ton Wearing Course Mixture; 1706 LB. Reinforcement Bars (Epoxy Coated); 202 S.Y. Bridge Approach Panels; 1 L.S. Traffic Control; and 112,395 L.F. 4 Inch Striping (Epoxy) Ground In. Plans and proposal price is $50.00 nonrefundable.
Plan, proposal and specifications can be examined and obtained from the Brown County Highway Department, 1901 N. Jefferson St., New Ulm, MN. 56073, ph#507-233-5700. A check, draft or money order in the amount listed above, and payable to the Brown County Treasurer must accompany requests for plans and proposals.
A bidder’s bond or a certified check payable to the Treasurer of Brown County in the amount of at least 5% of the total amount bid must be included.
Minimum wage rates to be paid by the Contractors have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581 and implementing regulations.
A minimum goal of 5.0 % Good Faith Effort to be subcontracted to Disadvantaged Business Enterprises.
Brown County reserves the right to reject any or all bids.
Dated: January 20, 2021
Sam Hansen, County Administrator
Brown County, MN
Project Major Items:
Number | Item | Units | Quantity |
---|
2011.601/00003 | CONSTRUCTION SURVEYING | LS | 1.00 |
2021.501/00010 | MOBILIZATION | LS | 1.00 |
2118.509/00010 | AGGREGATE SURFACING CLASS 1 | TON | 4,000.00 |
2118.609/00080 | AGGREGATE SURFACING SPECIAL | TON | 20,000.00 |
2215.504/00010 | FULL DEPTH RECLAMATION | S Y | 1,670.00 |
2232.504/00060 | MILL BITUMINOUS SURFACE (2.0") | S Y | 129,600.00 |
2232.504/00270 | MILL BITUMINOUS SURFACE (8.0") | S Y | 4,360.00 |
2301.502/00010 | DOWEL BAR | EACH | 856.00 |
2301.504/01060 | PLACE CONCRETE PAVEMENT 6" | S Y | 149,300.00 |
2301.504/01080 | PLACE CONCRETE PAVEMENT 8" | S Y | 4,360.00 |
2301.507/00010 | STRUCTURAL CONCRETE | C Y | 30,000.00 |
2301.602/00071 | DRILL & GROUT REINF BAR (EPOXY COATED) | EACH | 790.00 |
2301.609 | CONCRETE SAFETY EDGE | L F | 90,500.00 |
2357.606/00020 | BITUMINOUS MATERIAL FOR SHOULDER TACK | GAL | 5,400.00 |
2360.509/22200 | TYPE SP 12.5 WEARING COURSE MIX (2;B) | TON | 1,600.00 |
2401.508/00011 | REINFORCEMENT BARS (EPOXY COATED) | LB | 1,706.00 |
2406.504/00010 | BRIDGE APPROACH PANELS | S Y | 202.00 |
2563.601/00010 | TRAFFIC CONTROL | LS | 1.00 |
2582.503/16104 | 4" SOLID LINE PAINT GR IN | L F | 102,675.00 |
2582.503/16204 | 4" BROKEN LINE PAINT GR IN | L F | 9,720.00 |