- Project Number:
- Project: Z82
- Contract Number:
- Project: Z82
- Other Project Numbers:
- Z82
- Project Description:
- North 1st Street
- Construction Location:
- City or Township:
- Marshall
- Bid Opening:
- 02/05/2021 10:00 AM
- Expected Award Date:
- 02/09/2021
- Project Start Date:
- 04/19/2021
- Construction Start Date:
- 04/19/2021
- Construction End Date:
- 10/01/2021
- Work Type:
- Reconstruct
- Project Type:
- Road and Street
- Highest Funding Level:
- Local
- DBE Project:
- No
The City of Marshall, Minnesota will receive electronic bids only via BidVAULT until 10:00 a.m. (local time) on Friday, February 5, 2021, for the following project in MARSHALL, MINNESOTA:
PROJECT Z82: This project consists of: reconstruction and utility replacement on North 1st Street from East Main Street to West Marshall Street, on West Redwood Street from East College Drive to North 1st Street, and on West Marshall Street from East College Drive to North 1st Street; sanitary sewer, watermain, and storm sewer will be replaced. This project will also include new curb & gutter, new 5-ft. sidewalk on both sides of the streets, driveway aprons, water services, and sewer services to the right-of-way.
Estimated quantities of major work items for the project are as follows:
TYPE 9.5 WEARING COURSE MIX (3,C) – 1,870 TONS
CONCRETE CURB & GUTTER DESIGN B618 – 3,434 LF
COMMON EXCAVATION (P) – 3,233 CY
4” CONCRETE WALK – 11,672 SF
6” CONCRETE WALK – 2,800 SF
6” CONCRETE DRIVEWAY PAVEMENT – 585 SY
10” PVC PIPE SEWER – 932 LF
8” PVC PIPE SEWER – 429 LF
6” PVC PIPE SEWER – 286 LF
10” PVC WATERMAIN – 930 LF
8” PVC WATERMAIN – 405 LF
6” PERF PVC PIPE DRAIN – 3,365 LF
Prospective bidders must register as a Plan Holder to download plans and specifications. All bids shall be made electronically via BidVAULT and shall be accompanied by a cash deposit, cashier's check, bid bond or certified check, payable to the order of the City for not less than 10% of the bid. Instructions on submitting a bid electronically via BidVAULT can be found at the following: https://rtvision.atlassian.net/wiki/spaces/ONE/pages/12091421/Contractor+Guides. The cost to submit a bid is $25 plus a 3rd party payment processing fee.
A copy of the full Advertisement for Bid, Plans, and Specifications for this project can be found through the City of Marshall’s eGram website at https://egram.ci.marshall.mn.us. For any questions regarding this project, please contact Jessie Dehn, Assistant City Engineer, at Jessie.Dehn@ci.marshall.mn.us or 507-537-6773.
Jason R. Anderson, P.E.
Public Works Director/City Engineer
Project Major Items:
Number | Item | Units | Quantity |
---|
2106.607/00010 | EXCAVATION - COMMON | CU YD | 3,233.00 |
2360.609 | TYPE SP 9.5 WEARING COURSE MIX (3;C) | TON | 1,870.00 |
2502.503/09060 | 6" PERF PVC PIPE DRAIN | L F | 3,365.00 |
2503.603/21006 | 6" PVC PIPE SEWER | L F | 286.00 |
2503.603/21008 | 8" PVC PIPE SEWER | L F | 429.00 |
2503.603/21010 | 10" PVC PIPE SEWER | L F | 932.00 |
2504.603/02008 | 8" PVC WATERMAIN | L F | 405.00 |
2504.603/02010 | 10" PVC WATERMAIN | L F | 930.00 |
2521.618 | 4" CONCRETE WALK | S F | 11,672.00 |
2521.618 | 6" CONCRETE WALK | S F | 2,800.00 |
2531.504/00060 | 6" CONCRETE DRIVEWAY PAVEMENT | S Y | 585.00 |
2531.603 | CONCRETE CURB & GUTTER DESIGN B618 | L F | 3,434.00 |