Project Number:
Project: Z82
Contract Number:
Project: Z82
Other Project Numbers:
Z82
Project Description:
North 1st Street
Construction Location:
City or Township:
Marshall
Bid Opening:
02/05/2021 10:00 AM
Expected Award Date:
02/09/2021
Project Start Date:
04/19/2021
Construction Start Date:
04/19/2021
Construction End Date:
10/01/2021
Work Type:
Reconstruct
Project Type:
Road and Street
Highest Funding Level:
Local
DBE Project:
No
The City of Marshall, Minnesota will receive electronic bids only via BidVAULT until 10:00 a.m. (local time) on Friday, February 5, 2021, for the following project in MARSHALL, MINNESOTA:

PROJECT Z82: This project consists of: reconstruction and utility replacement on North 1st Street from East Main Street to West Marshall Street, on West Redwood Street from East College Drive to North 1st Street, and on West Marshall Street from East College Drive to North 1st Street; sanitary sewer, watermain, and storm sewer will be replaced. This project will also include new curb & gutter, new 5-ft. sidewalk on both sides of the streets, driveway aprons, water services, and sewer services to the right-of-way.

Estimated quantities of major work items for the project are as follows:

TYPE 9.5 WEARING COURSE MIX (3,C) – 1,870 TONS
CONCRETE CURB & GUTTER DESIGN B618 – 3,434 LF
COMMON EXCAVATION (P) – 3,233 CY
4” CONCRETE WALK – 11,672 SF
6” CONCRETE WALK – 2,800 SF
6” CONCRETE DRIVEWAY PAVEMENT – 585 SY
10” PVC PIPE SEWER – 932 LF
8” PVC PIPE SEWER – 429 LF
6” PVC PIPE SEWER – 286 LF
10” PVC WATERMAIN – 930 LF
8” PVC WATERMAIN – 405 LF
6” PERF PVC PIPE DRAIN – 3,365 LF

Prospective bidders must register as a Plan Holder to download plans and specifications. All bids shall be made electronically via BidVAULT and shall be accompanied by a cash deposit, cashier's check, bid bond or certified check, payable to the order of the City for not less than 10% of the bid. Instructions on submitting a bid electronically via BidVAULT can be found at the following: https://rtvision.atlassian.net/wiki/spaces/ONE/pages/12091421/Contractor+Guides. The cost to submit a bid is $25 plus a 3rd party payment processing fee.

A copy of the full Advertisement for Bid, Plans, and Specifications for this project can be found through the City of Marshall’s eGram website at https://egram.ci.marshall.mn.us. For any questions regarding this project, please contact Jessie Dehn, Assistant City Engineer, at Jessie.Dehn@ci.marshall.mn.us or 507-537-6773.

Jason R. Anderson, P.E.
Public Works Director/City Engineer
Project Major Items:
NumberItemUnitsQuantity
2106.607/00010EXCAVATION - COMMONCU YD3,233.00
2360.609TYPE SP 9.5 WEARING COURSE MIX (3;C)TON1,870.00
2502.503/090606" PERF PVC PIPE DRAINL F3,365.00
2503.603/210066" PVC PIPE SEWERL F286.00
2503.603/210088" PVC PIPE SEWERL F429.00
2503.603/2101010" PVC PIPE SEWERL F932.00
2504.603/020088" PVC WATERMAINL F405.00
2504.603/0201010" PVC WATERMAINL F930.00
2521.6184" CONCRETE WALKS F11,672.00
2521.6186" CONCRETE WALKS F2,800.00
2531.504/000606" CONCRETE DRIVEWAY PAVEMENTS Y585.00
2531.603CONCRETE CURB & GUTTER DESIGN B618L F3,434.00
Project Owner:

Anderson, Jason
344 West Main Street
Marshall, MN   56258
507-537-6773
Jessie.Dehn@ci.marshall.mn.us
Project Engineer:

Dehn, Jessie
344 West Main Street
Marshall, MN   56258
507-537-6773
Jessie.Dehn@ci.marshall.mn.us