- Project Number:
- 015-090-002
- Contract Number:
- Other Project Numbers:
- 19-013 015-090-002
- Project Description:
- The Project consists of constructing approximately 1 mile of a 10â™ wide bituminous trail. Work includes grading, aggregate base, bituminous, and concrete.
- Construction Location:
- City or Township:
- Clearbrook
- Bid Opening:
- 10/05/2020 10:00 AM
- Expected Award Date:
- 10/16/2020
- Project Start Date:
- 05/24/2021
- Construction Start Date:
- 05/24/2021
- Construction End Date:
- 07/12/2021
- Work Type:
- Excavation
- Project Type:
- Parks and Recreation
- Highest Funding Level:
- Federal
- DBE Project:
- Yes
Sealed Bids for the construction of the Clearbrook Trail project (S.P. 015-090-002) will be received by the Clearwater County and the City of Clearbrook, at the City of Clearbrook City Hall, 200 Elm St, PO Box 62, Clearbrook, MN 56634, until 10:00 a.m., local time on Monday, October 5th, 2020, at which time the Bids received will be publicly opened and read. Social distancing protocols shall be in place, and masks will be required. The Project consists of constructing approximately 1 mile of a 10â™ wide bituminous trail. Work includes grading, aggregate base, bituminous, and concrete.
Project Major Items:
Number | Item | Units | Quantity |
---|
2104.504 | Remove Bituminous Pavement | Sq Yd | 462.00 |
2105.507 | Common Excavation | Cu Yd | 5,256.00 |
2105.507 | Select Granular Borrow | Cu Yd | 1,237.00 |
2211.509 | Aggregate Base Class 5 | Ton | 2,207.00 |
2360.509 | Type SP 9.5 Wearing Course Mix (2,B) | Ton | 998.00 |
2411.618 | Modular Block Retaining Wall | Sq Ft | 450.00 |
2501.503 | 12" CS Pipe Culvert | Lin Ft | 72.00 |
2501.503 | 18" RC Pipe Class III | Lin Ft | 14.00 |
2501.503 | 36" RC Pipe Class III | Lin Ft | 34.00 |
2521.518 | 4" Concrete Walk | Sq Ft | 733.00 |
2521.518 | 6" Concrete Walk | Sq Ft | 2,051.00 |
2565.616 | Pedestrian Crosswalk Flasher System | System | 2.00 |